Similar Projects
Pomega Energy Storage / Kontrolmatik Technologies Lithium-Ion Battery Factory Phase 1
New Construction, Infrastructure - 650,000 SF
Conception
$350,000,000 CJ est. value
Walterboro, SC 29488

Pomega Energy Storage / Kontrolmatik Technologies Lithium-Ion Battery Factory Phase 2
New Construction, Infrastructure - 350,000 SF
Conception
$190,000,000 CJ est. value
Walterboro, SC 29488

Sc 63 Safety Improvements in Colleton County
Infrastructure
Bidding
$4,000,000 CJ est. value
Islandton, SC 29475

Sc 63 Safety Improvements in Colleton County
Infrastructure
Bidding
$4,000,000 CJ est. value
Islandton, SC 29475

Full Depth Patch-District 6
Infrastructure
Post-Bid

Parking Lot Repairs Colleton County Middle School (CCMS) and Thunderbolt Career and Technology Center (TCTC)
Infrastructure
Post-Bid
$300,000 est. value
Walterboro, SC 29488

Preservation - District 6
Infrastructure
Results

Parking Lot Repairs CCMS And TCTC
Infrastructure
Results
SC

Sewer Upgrades - Sub-Systems 1 East and 3 Contract II
Infrastructure
Post-Bid
$700,000 CJ est. value
Walterboro, SC 29488

Colleton - Bennetts Point Facility Public Access
Infrastructure
Results
$125,000 to $185,000 est. value
Green Pond, SC 29446

Walterboro Wastewater Treatment Plant Expansion Phases I and II
Addition, Demolition, Infrastructure
Post-Bid
$22,100,000 CJ est. value
Walterboro, SC 29488

Local and State Road Resurfacing
Infrastructure
Results
SC

RFQ - Construction Engineering and Inspection (CE&I) Services - Gadsden Loop Neighborhood Revitalization Sidewalk Project
Term Contract
Post-Bid
Walterboro, SC 29488

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Edisto Beach Groin No. 2 Repair
Infrastructure
Post-Bid
$135,250 CJ est. value
Edisto, SC 29438

Last Updated 05/25/2023 12:02 AM
Project Title

Walterboro Wildlife Sanctuary - Boardwalk Reconstruction

Physical Address View project details and contacts
City, State (County) Walterboro, SC 29488   (Colleton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,877,795 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of 5/24/2023, this project is yet to be awarded. A timeline for award was not determined. The Project has an expected duration of 200 days. The Project includes the following Work: Base Bid: Demolition, removal, and proper disposal of the existing pressure-treated wood boardwalk. Installation and maintenance of erosion control measures throughout construction. Construction of a replacement boardwalk using drilled metal or driven wooden piers and precast concrete members. Construction of two precast metal bridges with concrete decking. Construction of miscellaneous items (e.g., bollards, retaining wall, etc.) appurtenant to the boardwalk construction. Alternate Bid: In lieu of the precast concrete boardwalk, provide a pressure treated wooden boardwalk. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Email: Tony.hauser@wsp.com B. Phone: (828) 337-5173 - Send a text message in advance of the call identifying who you are and the nature of your call. Questions received less than seven days prior to the date for opening of Bids may not be answered Question Deadline 05/01/2023

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents