Similar Projects
Gym Air Conditioning at Middle/High School
Renovation
Design
$205,666 CJ est. value
Crivitz, WI 54114

Replacing Existing Air Handlers - Fort McCoy, WI
Renovation
Design
$1,000,000 CJ est. value
Fort McCoy, WI 54656

Boiler Controls Update at the Public Safety Building
Renovation
Bidding
$400,000 CJ est. value
Kenosha, WI 53140

South Housing Ventilation Upgrades
Renovation
Sub-Bidding
$145,500 CJ est. value
Prairie du Chien, WI 53821

HVAC Controls Replacement - John C Burke Correction Center
Renovation
Sub-Bidding
$165,000 CJ est. value
Waupun, WI 53963

2022 Medical Examiner Facility CT Scanner Room - HVAC and Electrical Proposals
Renovation
Post-Bid
$200,000 CJ est. value
New Richmond, WI 54017

HVAC and HE+ Furnace Program - Materials and Labor (Weatherization)
Alteration
Post-Bid
Milwaukee, WI

Dewey Water Distribution Building HVAC Upgrade
Renovation
Results
$147,207 CJ est. value
Manitowoc, WI 54220

Repair HVAC B103
Infrastructure
Results
$100,000 to $250,000 est. value
Fort McCoy, WI 54656

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

Replace Boiler Building 121 and 122
Renovation
Construction
$159,230 CJ est. value
Camp Douglas, WI 54618

Vendor Service Contract for HVAC Maintenance and Repair Services
Term Contract
Sub-Bidding
Milwaukee, WI 53202

Air Handling Units for Rec Plex
Renovation
Post-Bid
$300,000 CJ est. value
Oshkosh, WI 54901

Bldg 200 Repair by Replacement Boiler and Controls and Repair Air Compressor Exhaust
Infrastructure
Results
$1,000,000 to $2,000,000 est. value
Fort McCoy, WI

Levis Water Heater Replacement
Renovation
Construction
$79,550 CJ est. value
Black River Falls, WI 54615

Last Updated 10/16/2023 10:10 AM
Project Title

HVAC System Renovation Chancellors Hall - GPC

Physical Address View project details and contacts
City, State (County) Eau Claire, WI 54701   (Eau Claire County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $1,136,500 [brand] Estimate
Plans Available from Not Specified
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of: Replacement of chilled water coils and installation of hot water reheat coils at five air handling units. Pneumatic controls will be removed and direct digital controls will be installed serving all the HVAC equipment in the building. Supply ductwork replaced in five study areas. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Bidding Documents will be available online immediately upon the project being advertised for bid.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents