Similar Projects
Construction Manager at Risk - Highland Heights, Heights Line and Mclemore Avenue Projects
Infrastructure
Bidding
$6,716,100 est. value
Memphis, TN

Concrete Replacement and Asphalt Pavement
Post-Bid
Bartlett, TN

Asphalt Recess Surface and Walking Path
Post-Bid
Memphis, TN 38106

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

Street Resurfacing Spring 2021
Results
Collierville, TN

Arlington Bike and Pedestrian Trail
Post-Bid
Arlington, TN 38002

Wolf River Lateral IA Bank Stabilization (Red Bark Cove)
Results
Collierville, TN 38017

North Front Street Infrastructure Improvements
Post-Bid
Memphis, TN 38167

ADA Curb Ramps - Group 63
Results
$312,732 est. value
Memphis, TN

Parking Lot Resurfacing - Collierville Schools
Post-Bid
Collierville, TN 38017

ADA Curb Ramps - Group 62
Results
$633,100 est. value
Memphis, TN

Sidewalk Replacement and Improvements
Post-Bid
Memphis, TN

FY 2021 Asphalt Paving, North Section
Results
Memphis, TN 38103

Hot Asphalt Mix
Term Contract
Post-Bid
Germantown, TN

FY 2021 Asphalt Paving, South Section
Results
Memphis, TN 38103

Reported 04/15/2022 12:00 AM
Project Title

Brother Boulevard and Yale Road Resurfacing

Physical Address View project details and contacts
City, State (County) Bartlett, TN 38133   (Shelby County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Brother Blvd. and Yale Rd. resurfacing project limits are: Brother Blvd. from SR-15 (US-64/Stage Road) to SR-177 (North Germantown Road) and Yale Road from Kirby Whitten Road to Brother Blvd. The project consists of: milling and paving with select areas of sub-grade repair, curb and gutter replacement, driveway apron replacement, curb ramps, pavement markings, traffic control, and drainage work. All work will take place within existing right-of-way. The project length is approx. 3.411 miles with approx. 16.468 miles of total lane resurfaced.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents