Similar Projects
Tempe Campus Student Housing Renovations
Renovation
Conception
Tempe, AZ 85281

Tempe Campus Core Support Research Facility
New Construction
Conception
Tempe, AZ 85281

Contractor 2022 Simplified Construction Program
New Construction
Bidding
Less than $100,000 est. value
Tempe, AZ

Bateman Physical Science Center F-Wing 6th Floor Renovation
Renovation
Post-Bid
Tempe, AZ 85281

Macro Technology Works (MTW) Lab Tenant Improvements
Renovation
Post-Bid
Tempe, AZ 85284

Tempe New Academic Building
New Construction - 143,000 SF
Results
Less than $58,000,000 est. value
Tempe, AZ

Estrella Mountain Community College - Komatke Hall Remodel, Phase I
Renovation
Results
$1,750,000 to $2,000,000 est. value
Avondale, AZ 85392

Applied Research Building
New Construction - 60,000 SF
Construction
Less than $33,000,000 est. value
Phoenix, AZ

Notre Dame Prep Performing Arts Theater f/k/a/ St. Catherine of Bologna Performing Arts Center
New Construction - 19,672 SF
Construction
$6,800,000 est. value
Scottsdale, AZ 85260

West Campus Student Housing Academic/Office Space
New Construction
Conception
Glendale, AZ 85306

Farrington Softball Stadium Locker Room Expansion
Renovation
Post-Bid
Tempe, AZ 85281

Rio Salado College Tower, 3rd Floor Remodel
Renovation
Results
$1,500,000 est. value
Tempe, AZ 85281

Durham Hall
Renovation - 137,065 SF
Construction
Tempe, AZ 85281

Polytechnic Campus Student Union Expansion
Renovation, Addition - 65,000 SF
Conception
Mesa, AZ 85212

RFQ Construction Manager at Risk - Mid-Scale RI-1 Facility for Open Research in a Compressed Environment (MSRI-1 FORCE) Lab Renovation
Renovation - 3,000 SF
Post-Bid
$3,000,000 est. value
Tempe, AZ 85281

Last Updated 08/24/2022 10:04 AM
Project Title

Phase XXI Roadway and Traffic Signal Improvements

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85212   (Maricopa County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $12,431,642 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Eastmark Community Facilities Districts No. 1 and No. 2 Phase XXI Roadway Improvement Range 9,400,000 to 11,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated Project Completion Date 04/22/2025

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents