Similar Projects
Engine 31 HVAC Installation - 197-108 - City of Baltimore
Alteration
Conception
$70,000 est. value
Baltimore, MD 21218

USACE Philadelphia District-wide SRM MATOC
New Construction
Design
$25,000,000 to $100,000,000 est. value
Philadelphia, PA 19107

Project Labor Agreement (PLA Survey) to $450M Construction Multiple Award Task Order Contract (MATOC)
New Construction, Renovation
Design

RFP - Comprehensive Environmental Compliance and Engineering Services
Term Contract
Bidding
Baltimore, MD 21202

DLLR - HVAC Preventative Maintenance Multiple Labor Locations
Term Contract
Sub-Bidding
Baltimore, MD 21202

DLLR - HVAC Preventative Maintenance Multiple Labor Locations
Term Contract
Sub-Bidding
Baltimore, MD 21202

New Maryland Indefinite Delivery/Indefinite Quantity Multiple Award Contract for Construction Services
Post-Bid
$250,000 to $3,000,950 est. value

8(a) Small Business Multiple Award Construction Contract
New Construction, Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value

Z--Alterations and Repairs to SSA Headquarter Buildings
New Construction, Renovation
Results
Baltimore, MD 21235

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

MDOT MTA Riverside Heavy Maintenance Building Trade Packages
New Construction - 30,000 SF
Construction
MD

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Building Glass Installation and Repair Services
Renovation
Sub-Bidding
$200,000 CJ est. value
Baltimore, MD 21202

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

D/B Northeast MATOC
Results
$1,000,000 to $250,000,000 est. value

Last Updated 08/04/2022 07:34 PM
Project Title

Bush Bus Division Building 5 HVAC Equipment Upgrades

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21230   (Baltimore City County)
Category(s) Government/Public, Single Trades
Sub-Category(s) HVAC, Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,796,600 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Bush Bus Division Building 5 HVAC upgrades. Work includes demolition of existing HVAC equipment, including 40-ton and 10-ton air handling units. Demolition of existing steam to hot water heat exchanger. Installation of new chilled water air handling units. Installation of new air cooled chiller, chiller platform and and associated pumps. MBE Participation (%) 20.0 D - $1,000,000 to $2,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents