Similar Projects
Construction Services for Well 3 at Water Treatment Plant 2
Infrastructure
Bidding
$750,000 est. value
Mount Dora, FL 32757

Southwest Water Treatment Plant Production Well 3 Construction and Testing
Infrastructure
Bidding
FL

Wet Well Cleaning
Post-Bid
North Port, FL

Pump for Reclaimed Water Distribution, Vertical Turbine, OEM
Post-Bid
FL

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

DX38 Dynamometer Pump and Motor Replacement Coast Guard Engineering
Results
$45,000 est. value
Miami Beach, FL 33139

Water Treatment Plant 11 Supply Wells and Upgrades
Infrastructure
Bidding
$1,670,000 est. value
Deltona, FL

Well Boring and Drilling
Post-Bid
Tampa, FL

Mechanical Integrity Testing of the SRPF, WTP 11, and SROC Deep Injection Well Projects
Results
$145,000 est. value
Belle Glade, Boca Raton, Delray Beach, FL

Southwest Wellfield Project, Phase 1; West Polk Lower Floridan Aquifer Project Phase 1; Construction Manager At Risk, Polk Regional Water Cooperative
Infrastructure, Alteration
Bidding
$462,000,000 est. value
Winter Haven, FL

Flygt and ABS Pumps, Parts and Repairs
Post-Bid
FL

Pump Rehabilitation and Repair
Results
Cape Coral, FL 33915

High Service Pump Replacement at 1A Water Treatment Plant
Infrastructure
Bidding
$11,000 est. value
Lauderdale Lakes, FL 33319

Southwest Water Treatment Plant 3 Test Well Specifications
Post-Bid
Kissimmee, FL

Wellfield Rehabilitation, Maintenance and New Construction
Results
Wellington, FL 33414

Last Updated 04/18/2022 12:40 PM
Project Title

Reed Canal Park Stormwater Pond Pump

Physical Address View project details and contacts
City, State (County) South Daytona, FL 32119   (Volusia County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the purchase and installation of a staionary, inline, submerible pump model MWI SEA312 or comparable, rated for 3000 gpm at 6.5' tdh. Pump shall be operated with "soft start" automatic start/stop controls.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents