Similar Projects
Demolition of Operators Quarters Building and Installation of Underground Utilities, Mansfield Hollow Lake, Mansfield Center
Demolition, Infrastructure
Design
$250,000 CJ est. value
Mansfield Center, CT 06250

Tolland Fire Department Replacement of Stations - 440
Demolition, New Construction, Infrastructure - 4,600 SF
Design
$5,000,000 CJ est. value
Tolland, CT 06084

Tolland Fire Department Replacement of Fire Station 340
Demolition, New Construction, Infrastructure - 4,600 SF
Bidding
$1,600,000 CJ est. value
Tolland, CT 06084

RFP D/B - Community Center Design Build
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Andover, CT 06232

Eagleville Green
New Construction, Infrastructure - 13,368 SF
Sub-Bidding
$13,000,000 CJ est. value
Storrs Mansfield, CT 06268

Eagleville Green
New Construction, Infrastructure - 13,368 SF
Sub-Bidding
$13,000,000 CJ est. value
Storrs Mansfield, CT 06268

Reconstruction of Evergreen Lane
Infrastructure
Post-Bid
Stafford, CT

Reconstruction of Evergreen Lane
Infrastructure
Post-Bid
Stafford, CT

Installing New Stenciled Sidewalk at the Veteran's Memorial Ellington Green
Infrastructure
Results
$115,000 est. value
Ellington, CT

Repair and Replacement of Sidewalks
Infrastructure
Results
Somers, CT

New Softball Complex - Miller Richardson Park - Town of Coventry
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Coventry, CT 06238

Able Coil and Electronics Co Expansion
Addition, Demolition, Infrastructure - 12,000 SF
Pending Verification
$1,500,000 CJ est. value
Bolton, CT 06043

Public Works Facility - Town of Hebron
New Construction, Infrastructure - 17,800 SF
Design
$8,000,000 CJ est. value
Hebron, CT 06248

RFQ Construction Manager at Risk - South Campus Infrastructure
New Construction, Renovation, Infrastructure
Post-Bid
$62,500,000 CJ est. value
Storrs Mansfield, CT 06269

Intersection Improvements at Swamp Road and Boston Turnpike
Infrastructure
Results
Coventry, CT 06238

Last Updated 11/02/2022 05:09 PM
Project Title

Andover Municipal Parking Hub - Town Hall Andover

Physical Address View project details and contacts
City, State (County) Andover, CT 06232   (Tolland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope of work has not been disclosed. As of November 2, 2022, this project is in the conceptual phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to November 2023.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents