Similar Projects
MP2001-C1 - FY21-22 Small Item Waterfront Repair
Bidding
$1,050,000 est. value
East Boston, MA

Water and Sewer On-Call Repair Contract
Bidding
$200,000 est. value
Winthrop, MA

Inspection, Testing, Maintenance, and Certification of Approximately 150 MBTA Standpipes Zones
Post-Bid
Boston, MA

Maintenance of PH Meters and Flowmeters
Term Contract
Post-Bid
Boston, MA 02116

Fire Flow Water Meters
Results
Boston, MA

Large Water Meters
Results
Boston, MA 02119

Standpipe Repair
Post-Bid
Boston, MA

Emergency Repairs to Water Services Citywide
Results
Less than $1,300,000 est. value
Boston, MA

One 12" Check Valve W/Lever and Weight
Post-Bid
Boston, MA 02129

Emergency Waterline, Valve, Hydrant Repairs
Term Contract
Results
Less than $2,000,000 est. value
East Boston, MA

Ten 6" Swing Check Valves W/Lever and Weight
Post-Bid
Boston, MA 02129

Five Fire Hydrants, A-423 5-1/4" Three Way
Results
Boston, MA 02129

Broadway Water and Sewer Improvements
Post-Bid
Chelsea, MA

Replacement of Water Mains and Replacement and Rehabilitation of Sewer and Drain Pipes
Results
Less than $3,840,188 est. value
Boston, Hyde Park, Jamaica Plain, Mattapan, Roslindale, Roxbury, MA

Replacement of Lead Services
Post-Bid
$600,000 est. value
Winthrop, MA

Reported 05/02/2020 12:00 AM
Project Title

Underground Pipe Repair

Physical Address View project details and contacts
City, State (County) Boston, MA 02210   (Suffolk County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The United States Army Contracting Command - New Jersey is issuing this Sources Sought Notice in an effort to perform market research to assist in determining the appropriate acquisition strategy for the repair of damaged water pipe at Barnes Building 495 Summer Street, Boston, MA 02210 in support of the 99th Readiness Division. The government intends to award a single firm-fixed-price type contract as a result of the solicitation to be issued. The expected period of performance is seven (7) calendar days from the Notice to Proceed date to complete ALL TASKS associated with the Specification of Work (SOW). The contractor is required to furnish all labor, expertise, equipment, materials, transportation, and appliances necessary to replace light pole fixture and related wiring.

Details

Division 26 - Electrical, Common Work Results for Electrical, Wiring Connections, Exterior Lighting, Lighting Poles and Standards.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents