Similar Projects
Campground Development - 459-054 - City of Sioux City
Infrastructure
Conception
$2,550,000 CJ est. value
Sioux City, IA 51101

Leeds Connector - 459-320 - City of Sioux City
Infrastructure
Conception
$250,000 CJ est. value
Sioux City, IA 51101

18th Street Viaduct - 719-071 - City of Sioux City
New Construction, Infrastructure
Design
$800,000 CJ est. value
Sioux City, IA 51105

18th Street Viaduct - 719-071 - City of Sioux City
New Construction, Infrastructure
Design
$800,000 CJ est. value
Sioux City, IA 51105

Construction of the Cone Park - Natural Surface Trails Project
Infrastructure
Bidding
$1,133,604 CJ est. value
Sioux City, IA 51106

Construction of the Cone Park - Natural Surface Trails Project
Infrastructure
Bidding
$1,133,604 CJ est. value
Sioux City, IA 51106

Fire Hydrant Cleaning/Painting Project
Infrastructure, Alteration
Post-Bid
Sioux City, IA

29th Street Reconstruction (Jones Street to Cheyenne Boulevard)
Infrastructure
Post-Bid
$6,150,000 CJ est. value
Sioux City, IA 51104

PCC Sidewalk/Trail
Infrastructure
Results
Sioux City, IA

PCC Pavement - Replace - K64
Infrastructure
Results
IA

SUX Aviation Center Project Rebid
New Construction, Infrastructure - 39,400 SF
Pending Verification
$13,644,584 CJ est. value
Sioux City, IA 51111

Moville Area Medical Clinic
New Construction, Infrastructure - 10,000 SF
Pending Verification
$5,900,000 CJ est. value
Moville, IA 51039

Wastewater Treatment Plant (WWTP) Capacity Expansion - 539-223 - City of Sioux City
Addition, Infrastructure
Conception
$1,310,000 CJ est. value
Sioux City, IA 51101

Plywood Trail - 459-321 - City Of Sioux City
Infrastructure
Design
$2,000,000 CJ est. value
Sioux City, IA 51101

Moville 2nd Street Overlay
Infrastructure
Post-Bid
$350,000 est. value
Moville, IA 51039

Last Updated 03/08/2023 10:33 PM
Project Title

2023 Western Iowa Tech Community College Parking Lot 5 and 6 Paving Improvements Project

Physical Address View project details and contacts
City, State (County) Sioux City, IA 51106   (Woodbury County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,050,232 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Each bid must be accompanied in a separate envelope by one of the following: a deposit of money, Certified Check, Cashier's Check, or Credit Union Certified Share Draft, or a Bid Bond to be executed by a corporation authorized to contract as a surety in the state of Iowa, in an amount equal to ten percent (10%) of the amount of the Bid, made payable to Western Iowa Tech Community College, Sioux City, Iowa, and may be cashed by the Board as liquidated damages in the event the successful Bidder fails to enter into a Contract and file a 100% performance and payment bond satisfactory to the Board assuring the faithful fulfillment of the Contract and maintenance of said improvements as required by law, the provisions of this notice and the Contract Documents within ten (10) days after acceptance of his Bid. The Owner will, in evaluating Bids, consider the requirements of the resident bidder preference law, and allow such preferences to resident bidders as are required to be allowed under State Law. Bidder shall, when submitting a Bid, furnish an executed Bidder Status Form for the Owner to use when applying the preference law. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected. Bid Security of the two lowest Bidders will be retained until contract has been awarded and executed but no longer than 30 days after the opening of bids. No Bidder may withdraw his bid within 30 days after opening of bids. The successful Bidder will be required to furnish a Performance Bond and Material and Labor Payment Bond in an amount equal to one hundred percent (100%) of the Contract Sum, issued by a responsible surety approved by the Board and shall guarantee the faithful performance of the Contract and terms and conditions therein contained and the maintenance of said improvements pursuant to the provisions of the Contract Documents. Bids shall remain in effect for a period of thirty (30) days, commencing on bid due date. The Owner will issue tax exemption certificates to contractors and subcontractors on this project. Contractors and subcontractors may make copies of these certificates and give them to each supplier providing construction materials. Sales tax will not be charged on construction materials purchased using the tax exemption certificates. Monthly estimates will be paid to the Contractor as the work progresses in amounts equal to ninety-five percent (95%) of the Contract value of the work completed during the preceding calendar month. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work, partially or totally completed. Final payment of the five percent (5%) due the Contractor will be made thirty (30) days after final acceptance of the work under the Contract by the Owner if no claims are on file and after receipt of satisfactory evidence that all claims pertaining to such Contract have been paid in full as provided in the Contract Documents for said work. The Contractor shall begin work after receipt of a Notice to Proceed, which is anticipated to be issued on May 1, 2023. All work on the project shall be substantially complete on or before August 15, 2023 and ready for final acceptance on or before September 1, 2023. All bids shall be filed on forms included in the Project Manual, furnished by the Engineer, sealed and plainly marked. Any alteration of the bid form may be cause for rejection of the proposal. The WITCC Board of Directors reserves the right to reject any or all bids, re-advertise for all bids and to waive any or all formalities that may be in the best interest of Western Iowa Tech Community College.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents