Similar Projects
Amazon Warehouse
New Construction - 750,000 SF
Conception
$10,000,000 CJ est. value
Lakeville, MN

The Farm Mini Storage
New Construction - 34,800 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Cambridge, MN 55008

Mickelson Invesments Building
New Construction - 12,700 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Clearwater, MN

Inverpoint Business Center - Building 3
New Construction - 107,838 SF
Design
$10,000,000 CJ est. value
Inver Grove Heights, MN 55076

Dodge County Highway Maintenance Facility
Renovation, Addition
Bidding
Dodge Center, MN 55927

Prefabricated Telecommunications/Equipment Shelters
New Construction
Bidding
$135,000 to $145,000 est. value
Little Falls, MN 56345

MNDOT Mnroads Barn Insulation
Post-Bid
Monticello, Otsego, MN 55301

DOMOPS Storage Building
New Construction
Post-Bid
$1,000,000 to $5,000,000 est. value
Duluth, MN 55811

MnDOT Sleepy Eye Truck Station-General
Results
Less than $4,400,000 est. value
Sleepy Eye, MN 56085

Moose Lake Truck Station Campus - General
Results
Less than $3,250,000 est. value
Moose Lake, MN 55767

Freeborn-Mower Cooperative Services Headquarters
New Construction - 97,800 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Albert Lea, MN

MnDOT Northfield Truck Station Campus - General
New Construction
Construction
$4,674,000 est. value
Northfield, MN 55057

Crossroads Mall Climate Controlled Storage
Renovation, Build-Out, Alteration - 10,600 SF
Pending Verification
Hastings, MN 55033

Warehouse
New Construction - 210,400 SF
Pending Verification
Rosemount, MN 55068

Scannell Properties Office and Warehouse
New Construction - 305,000 SF
Conception
$10,000,000 CJ est. value
Maple Grove, MN 55369

Reported 12/08/2021 12:00 AM
Project Title

Material Recovery Building

Physical Address View project details and contacts
City, State (County) Detroit Lakes, MN 56501   (Becker County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the construction of an addition to the existing material recovery facility for Becker County located on the Becker County Solid Waste Campus, 24413, Co Rd 144, Detroit Lakes. The work includes the construction of a 13,650 square foot pre-engineered steel frame building addition attached to concrete footing building structure, grading, electrical, mechanical, and all other specified items specified for this addition to the material recovery facility.

Details

Warehouse/Storage, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents