Similar Projects
Bridge and Highway Maintenance Materials
Term Contract
Bidding

Road Material
Term Contract
Bidding
Quakertown, PA 18951

Liquid Bituminous Materials
Term Contract
Post-Bid

GSA Carbon
Post-Bid
Chalfont, PA 18914

Ultra-Thin Bonded Wearing Course, Single Bituminous Seal Coat
Results
Telford, PA

Aggregates
Post-Bid
PA

Road Material Aggregates
Post-Bid
Quakertown, PA

Stone
Post-Bid
Buckingham, PA 18912

Aggregates 2019-2020
Post-Bid
Bowmansville, Devault, Donegal, Everett, Gibsonia, Greensburg, Harrison City, Homewood, Jefferson Hills, Mount Gretna, New Cumberland, Newville, Plymouth Meeting, Quakertown, Slatington, Somerset, Trevose, PA

Bituminous Materials, Plant Mix
Post-Bid

Anti-Skid Material 2019
Post-Bid
Bensalem, Breezewood, Everett, Gibsonia, Irwin, Malvern, Manheim, Manns Choice, New Cumberland, Newville, Plymouth, Quakertown, Shade Gap, Smock, Somerset, Wampum, PA 15044

Purchase of Approximately 50970 Tons of Sodium Chloride in Bulk Deliveries for Snow and Ice Control
Post-Bid
Doylestown, PA 18901

Salt and De-Icing Materials
Term Contract
Post-Bid
Newtown, PA

Bituminous Materials, Plant Mix
Post-Bid

Consortium Stone Bid
Post-Bid
Chalfont, PA 18914

Reported 02/26/2019 12:00 AM
Project Title

Consortium Stone Bid

Physical Address View project details and contacts
City, State (County) Chalfont, PA   (Bucks County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Screening/Quarry Grit 700 tons 1/4 " Stone Chips 660 tons 1B-3/4" Stone 2,200 tons 1B-3/8" Stone 1,000 tons 1B-1/2" Stone 1,100 tons No.2 3/4 " Stone 2,550 tons No. 2B 3/4 " Stone 4,100 tons No. 3A 1 1/2 " Stone 250 tons No. 4 Ballast Stone 3,410 tons No. 5 Stone/Anti-Skid 125 tons No. 6S Stone/Anti-Skid 150 tons No. 2A Stone Mix 17,150 tons 3/4 " Stone Mix 2,660 tons 5-8" mix gabion stone 380 tons Rip-Rap Mixed Stone 3,630 tons R-4 Stone 2,920 tons ID2 1/4 " asphalt (top) 35 tons PSP Cold Patch 1,710 tons Sup. Pave 9.5mm Wearing 28,470 tons Sup. Pave 12.5mm Wearing 2,690 tons Sup. Pave 19.0mm Wearing 960 tons Sup. Pave 19.0mm Binder 3,830 tons Sup. Pave 25.0mm Binder 3,030 tons Sup. Pave 25.0mm Base 500 tons Concrete Sand 1/4" 20 tons AC-2000 Liquid Asphalt 500 gallons Koch 9005 Crack Sealer 1,010 lbs Koch 9075-r Flex-a-fill 1,010 lbs Screened Top Soil 720 tons 486 Cold Patch mix w/fiber 760 tons HEC-Concrete 3500 Mix 510 yards Crafco Poliflex II Crack Seal 44,000 lbs Detack 125 gallons Tack Coat 4,925 gallons QPR Cold Patch 435 tons DSA (Driving Superior Aggregate) 500 tons Crackmaster 3405 802 lbs High Performance 50 tons
Details
Division 31 - Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Special Foundations, Special Piles, Rammed Aggregate Piles.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents