Similar Projects
Asphalt Repair Project FY20
Post-Bid
Jacksonville, NC 28541

Blue Ridge Parkway
Post-Bid
$85,000,000 est. value

Fall 2019 District 1 Pavement Preservation
Results

Henderson Drive Resurfacing
Results
Jacksonville, NC 28543

Carolina Forest Boulevard Resurfacing
Post-Bid
Jacksonville, NC 28546

Onslow Asphalt Tier
Results
NC

Repair Pavement Building AS 4108
Post-Bid
$100,000 to $250,000 est. value
Camp Lejeune, NC

Training Road Repairs and Debris Removal, Phase III
Results
$10,000,000 to $25,000,000 est. value
Camp Lejeune, NC 28547

Rfb-Streets Division Asphalt Repair Project Fy21
Post-Bid
Jacksonville, NC

Installation of Drive Lane Extension Swansboro Middle School
Results
Less than $34,690 est. value
Swansboro, NC 28584

Elizabeth Street Asphalt Repair Project FY20
Results
Jacksonville, NC 28541

Milling, Resurfacing, and Shoulder Grading
Results
NC

FY 19 Street Rehabilitation Project
Results
Jacksonville, NC 28541

Windgate Park Apartments Street Resurfacing
Results
Less than $173,200 est. value
Jacksonville, NC 28541

Milling, Resurfacing, and Shoulder Grading
Results
NC

Last Updated 12/10/2020 12:43 PM
Project Title

Design-Bid-Build (DBB) Construction Project for P1346B/P1280B, Birch Street Road Improvements/Birch Street North at Marine Corps Base Camp Lejeune, North Carolina

Physical Address View project details and contacts
City, State (County) Camp Lejeune, NC   (Onslow County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will perform a series of roadway improvements to Birch Street and Duncan Street. Work includes the following: Construction of service and access road; widening of existing road; construction of turn lanes; rebuilding of road bed; milling and paving of existing road; creek crossing; installation of curbing; erosion repair of road embankment; installation, paving, and painting of pedestrian walkways, cross walks and jogging trails; stripping and marking of roadway; installation of traffic and pedestrian signals including poles; installation and movement of utility poles; installation of catch basins; installation of BMPs; and relocation of utilities (gas, water, electric, communication and sanitary sewer). Demolition: Project includes the demolition of steam pits; pavement; and foundation post. Facilities will be designed to meet or exceed the useful service life specified in DoD Unified Facility Criteria. Department of Defense and Department of the Navy principles for performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal law and Executive Orders. Low Impact Development (LID) will be include in the design and construction of this project as appropriate.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents