Similar Projects
Airport Wastewater Treatment Plant Expansion Project
Design
FL

City of Dunedin Water Treatment Plant Refurbishment
Term Contract
Post-Bid
$26,500,000 est. value
Dunedin, FL

Wastewater Treatment Facility Operations Building and Hardening Of Biosolids Facility
New Construction
Post-Bid
$66,750 est. value
Clearwater, FL

Oxygen Production Upgrades SDWWTP
Results
Less than $8,267,365 est. value
Miami, FL

Water and Wastewater Treatment Facility Rehabilitation and Repairs - WORCS 9
Term Contract
Results
Less than $1,320,000 est. value
FL

Westside Regional Water Reclamation Facility Improvements
Construction
Less than $30,500,000 est. value
Daytona Beach, FL 32124

Marion Oaks Water Treatment Plant 4 Upgrades
Construction
Less than $1,400,000 est. value
Ocala, FL 34473

Construction Manager, Cosme Water Treatment Plant Optimization and Header Valve Replacement Projects
Post-Bid
Odessa, FL

S--The Hoover Maintenance Plus Program Includes 24/7 Remote Monitoring of the Irrigation and Pump System Using Hoover Flowguard Combined with 2 Visits to the Site Per Year by a Hoover Certified Pump Technician.
Results
Sarasota, FL 34321

Deltona North Water Treatment Plant Improvements
Construction
Less than $1,800,000 est. value
De Land, FL 32720

Water Treatment Plant Filters
Term Contract
Post-Bid
FL

South County AWTP Expansion - Phase 3 and 4
Results
$8,200,000 est. value
Ruskin, FL

Plantation Bay Water Treatment Plant Improvements
Construction
Less than $3,750,000 est. value
Bunnell, FL 32110

Wastewater Reclamation Facility - Headworks Mechanical Screen Project
Post-Bid
Gainesville, FL

Trailer Mounted, Portable Self-Priming Pumps
Results
$67,700 est. value
FL

Last Updated 06/18/2019 03:50 PM
Project Title

New Well and Water Plant No. 4 & 5

Physical Address View project details and contacts
City, State (County) Jay, FL 32565   (Santa Rosa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Treatment Plant
Contracting Method
Project Status Construction Commenced February 2019, Construction Completion Expected February 2020
Bids Due View project details and contacts
Estimated Value $1,546,710
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents