Similar Projects
New Fire Station and City Hall
New Construction
Conception
$10,911,277 est. value
Steamboat Springs, CO 80487

Jail 1-East Roof Top Units - Weld County
Renovation
Conception
$390,000 CJ est. value
Greeley, CO 80631

NGCC Phase II - New City Hall Building
New Construction - 31,000 SF
Design
$18,000,000 est. value
Northglenn, CO

Basketball Court Replacement
Renovation
Design
$200,000 CJ est. value
Pueblo, CO 81003

City Hall 1st Floor Bathroom Remodels
Build-out
Bidding
$100,000 CJ est. value
Central City, CO 80427

Criminal Justice Center Transfer Showers ADA Barrier Corrections
Renovation
Bidding
$400,000 CJ est. value
Colorado Springs, CO 80906

City Hall Partial Remodel
Renovation
Post-Bid
Manitou Springs, CO 80829

Rifle City Hall Phase 3 Improvements Construction Manager/General Contractor
Renovation
Post-Bid
Rifle, CO 81650

CTF FCF Improvement Access Phase 1 CM/GC IDP RFP CMS164302
Renovation
Results
Less than $1,500,000 est. value
Canon City, CO 81212

CM/GC Services for the Justice Center Safety and Operational Improvements Project
New Construction
Results
Englewood, CO 80112

General Contractor Services for Chaffee County Assessor Office Remodel Project
Renovation
Construction
Salida, CO 81201

Mesa County Detention Facility Pod and Yard Renovations
Renovation
Construction
Grand Junction, CO 81501

Lake County Justice Center - Lake County
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Leadville, CO 80461

ACJC CH1 And CH2 Curtain Wall And Storefront Rehabilitation - Arapahoe County
Renovation
Conception
$800,000 CJ est. value
Englewood, CO 80112

Arapahoe County Justice Center - Kitchen and Laundry Room Expansion
Addition, Renovation
Design
$5,000,000 CJ est. value
Centennial, CO 80112

Last Updated 05/03/2023 11:42 AM
Project Title

Otero County Detention Center

Physical Address View project details and contacts
City, State (County) La Junta, CO 81050   (Otero County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall, Prison/Jail
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

An exact scope has not been provided. As of May 3, 2023, construction is expected to begin in the third quarter of 2023. The general contractor will bid this out to subcontractors privately. All inquires should be directed to the general contractor for any further information.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Detention Furniture, Multiple Seating.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents