Similar Projects
Kitchen Exhaust Fan Replacements - Various Schools
Alteration
Bidding
Chesapeake, VA 23322

Servicing of Oven Hoods - Various Schools
Alteration
Bidding
Chesapeake, VA

HVAC Services- DMV Norfolk-Widgeon Road CSC
Post-Bid
Chesapeake, Norfolk, VA 23513

HVAC and Mechanical Products
Term Contract
Post-Bid

Roof Top Air Handling Unit
Results
Chesapeake, VA 23323

HVAC Replacement - Portlock Primary School Media Center
Results
Chesapeake, VA

Air Purification Systems
Post-Bid
Chatham, Pound, Victoria, VA 23936

Rooftop Unit, RTVAV-8 HVAC Replacement - Greenbrier Middle School
Results
Chesapeake, VA

HVAC Maintenance and Repair
Post-Bid
Chesapeake, Portsmouth, VA 23322

Kitchen Hood Exhaust Fan Replacement - Treakle Elementary School
Results
Less than $26,614 est. value
Chesapeake, VA

Armstrong SF665DW Heater Replacement Parts
Post-Bid

Kitchen Exhaust Fans, Make-Up Ait Units and Hot Water Heater Replacement - Deep Creek High School
Results
Less than $79,900 est. value
Chesapeake, VA 23323

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Chiller Replacement - Sparrow Road Intermediate School
Results
Less than $249,875 est. value
Chesapeake, VA 23325

Fire Station Ventilation Systems
Alteration
Post-Bid
Chesapeake, VA

Last Updated 12/17/2021 04:30 PM
Project Title

HVAC System Replacement Project - Camelot Elementary School

Physical Address View project details and contacts
City, State (County) Chesapeake, VA 23323   (Chesapeake City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,200,000
Plans Available from Municipal Agency - 10/25/21
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the full replacement of all HVAC for the original building portion of Camelot Elementary School. The existing built-in dual duct air handler serving dual duct mixing boxes shall be replaced with rooftop gas pack type air conditioners. The existing gas-fired boilers shall remain. The existing air cooled chiller shall be removed and turned over to the Owner. All existing ductwork, piping, and pneumatic controls shall be removed. New DDC controls shall be provided. All existing ceilings shall be removed and new ceilings provided throughout the original building, for the mechanical demolition to occur. New LED light fixtures shall be provided in the new ceilings. Supporting electrical, architectural, and structural work will also be included.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents