Similar Projects
Hemlock Public Schools Bid Package #2 - KC Ling Elementary Gym Addition
Addition, Infrastructure - 60,740 SF
Sub-Bidding
$2,000,000 CJ est. value
Hemlock, MI 48626

Swan Valley Schools - Shields And Havens Additions
Addition
Post-Bid
$1,500,000 est. value
Saginaw, MI

2 Elem School Remote/Portable Classrooms
Renovation
Post-Bid

Jessie Rouse Elementary School Mechanical Revisions
Renovation
Results
$1,262,000 CJ est. value
Saginaw, MI 48601

Saginaw ISD Merrill ES & Thurston MS Recovery Rooms
Renovation
Results
$168,910 CJ est. value
Merrill, MI 48637

Shields Elementary School - 2021 Bond - Swan Valley School District
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Saginaw, MI 48609

Havens Elementary School - 2021 Bond - Swan Valley School District
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Saginaw, MI 48609

Saginaw Public Schools - New Handley Elementary School
New Construction
Post-Bid
Saginaw, MI 48602

Big Rock Elementary Bathroom Repairs
Renovation
Results
$54,226 CJ est. value
Chesaning, MI 48616

Flat Rock Esser Funds 2022 Project
Renovation
Post-Bid

Athletic Facility, Interior Improvements and Boiler Replacement BP1C
Renovation - 6,028 SF
Post-Bid
$1,500,000 est. value
Saginaw, MI

Atkins School Gymnasium Renovation Bid Package 1
Renovation
Post-Bid
$440,000 est. value
Saginaw, MI 48601

New Pre-Kindergarten Plaground Installations
Infrastructure
Post-Bid
$100,000 CJ est. value
Saginaw, MI 48601

Swan Valley Shields Elementary - Fence Improvement
Infrastructure
Post-Bid
$700,000 CJ est. value
Saginaw, MI 48609

Saginaw PSD New Handley Elementary School - BP#2 Technology Package
New Construction
Post-Bid
$300,000 CJ est. value
Saginaw, MI 48602

Last Updated 03/24/2023 01:46 AM
Project Title

Saginaw City School District - Zilwaukee Elementary School Mechanical Revisions

Physical Address View project details and contacts
City, State (County) Saginaw, MI 48604   (Saginaw County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,762,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Complete proposals will be received for the following work categories in accordance with drawings and specifications as prepared by the Architect, Engineers and Construction Manager. BID CATEGORY 1: MECHANICAL - ALL TRADES This project consists of Mechanical Renovations to Zilwaukee Elementary School. The Mechanical contractor shall bid as prime and shall include all trades work in their proposal. This project will be funded by federal ESSER Funds so the payment of Davis-Bacon Wages is required. The Owner requires that SEALED BIDS be delivered to the school district's administration building prior to the bid due date and time. No email or electronic bidding (through Building Connected) is allowed. All questions regarding the plans and specifications are to be emailed to Tim Muter - Project Superintendent (tim@rchendrick.com). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.($2M-3M) 1. Pay for all permits. Permits required include: Mechanical, plumbing, electrical. Permits are through the State of Michigan - NOT LOCAL 2. Schedule periodic inspections as required with Inspectors. 3. The awarded mechanical contractor is responsible for ALL work including but not limited to; plumbing, mechanical, electrical, temperature controls, roofing, concrete, structural steel, etc. 4. Provide all demolition, cutting, and patching as required to provide a complete system. 5. Provide and install any equipment pads as required for your work. 6. Provide removal of existing equipment as required for the installation of new work. 7. Provide relocation of existing piping and equipment for the installation of new work. 8. Provide patching of existing floors, walls, and roofs as needed and required. 9. Provide water and air balance as required. 10. Provide and install temperature controls as required for a complete heating system. 11. Provide all electrical work as required for a complete functional system including relocation of electrical conduit and equipment as required to install the new boilers, pumps and miscellaneous equipment. 12. Provide proper sealing of all penetrations. Boiler walls are rated one hour and all penetrations shall meet the one-hour fire rating. 13. Include all cutting and coring of walls, floors, ceilings, etc. as required for the installation of your work. 14. Remove / Replace ceilings as required for your work. 15. Include any roof patching / flashing as required. 16. Building must be kept water tight at all times. Any damage resulting from contractor leaving building open will be paid for at contractor's expense. 17. A General Trades allowance of $150,000 shall be included in the mechanical contractor bid. 18. Exclude from bid all associated cooling work, including electrical, chiller, pumps, pads, chilled water piping and controls for cooling and associated equipment. 19. Reference drawing M4.02. Unit Ventilators Schedule Note #2: Mechanical TCC shall provide 24- volt power for electronic air filter in lieu of Electrical Contractor. 20. Electrical: Refer to Sheet E2.02. Keyed Note #6: Change to read single line conduit represent the existing (4) paralleled conduits derived from the utility transformers secondary into the Boiler Room. The installation intends to utilize the existing conduits for the new service conductors into the new MDP. Extend / Rework the conduits within the Boiler Room for connection for the new MDP. Reference Keyed Note #2 and Keyed Note #3 on Sheet E3.01 that defines the new secondary service. 21. Refer to Sheet E3.01. Reference LP-G one line. The (2) 20-amp, 3-pull circuit breakers are not correct. Furnish and install 20-amp single pull circuit breakers. Utility transformer's location is not shown. Transformer is located just outside the Boiler Room within a chain link fence.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents