Last Updated | 11/17/2022 07:40 AM |
Project Title | Serramonte / Serra Center Signalization (911) - Town of Colma |
Physical Address | View project details and contacts |
City, State (County) | Colma, CA 94014 (San Mateo County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Demolition, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected March 2024 |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Install traffic signal on Serramonte Blvd at the Serra Center entrance (Target). The project will be partially funded by a development impact fee ($26,000). Estimated project cost of $500,000 includes for the signalization of the intersection, the road realignment work at Serramonte Boulevard and Collins Avenue and removing the existing slip lane, restriping of Serramonte Boulevard to simulate the proposed lane reduction on Serramonte Boulevard, plus design and project management costs associated with the project. Capital | Streets, Sidewalks, & Bikeways 138 The elimination of the slip lane will provide a safer approach for pedestrians and bicyclists as vehicles enter Collins Avenue. The removal of the slip lane will provide a landscape area for wayward signage, gateway signage and landscaping while entering into the Serramonte Auto Row District. Another aspect of this project is to install temporary street stripping to simulate how the lane reduction on Serramonte Blvd. will perform and if the lane reduction is feasible. The restriping of the roadway will simulate the proposed lane reduction and will take two lanes of travel in each direction and reconfigure it to one lane of travel in each direction with a turn lane in the middle of the roadway. The purpose of the middle lane will provide vehicles to enter a safe area to make left hand turns into the various car dealerships and retail outlets. Likewise, vehicles exiting the various businesses along Serramonte will be able to make safe left hand turns onto the roadway and be able to enter the middle lane before merging into the oncoming traffic lane. The signalization of the Serramonte/Serra Center intersection, roadway reconfiguration roadway striping is part of the Serramonte Blvd/Collins Ave Master Plan. These improvements have been separated for the Master Plan Project (CIP#905) for potential grant funding. This project is included in the city's 2022-2027 Capital Improvement Plan (CIP). As of November 17, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |