Similar Projects
Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

East Hillsdale and Foster City Boulevards Median Refurbishment - PK-03 - City of Foster City
Alteration
Conception
$500,000 est. value
Foster City, CA 94404

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

435 East 3rd Avenue Mixed-Use Development
Demolition, New Construction, Infrastructure - 33,876 SF
Design
$9,000,000 CJ est. value
San Mateo, CA 94401

Chrysler Stormwater Pump Station Improvements Project
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Menlo Park, CA 94025

Chrysler Stormwater Pump Station Improvements Project
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Menlo Park, CA 94025

Smooth Streets Program
Infrastructure
Post-Bid
San Mateo, CA

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Daily City DMV Field Office
Term Contract, Infrastructure
Post-Bid
Daly City, CA 94015

Downtown San Mateo Twinkle Light Maintenance
Alteration
Results
San Mateo, CA

Citywide Street Reconstruction Phase 2
Infrastructure
Results
$1,600,000 est. value
San Mateo, CA

South ECR WMR, Phase 1 Sanchez to Barroilhet - City of Burlingame
Infrastructure
Construction
$5,113,000 est. value
Burlingame, CA

MBC BioLabs / San Carlos
New Construction, Infrastructure - 152,582 SF
Construction
$40,000,000 CJ est. value
San Carlos, CA 94070

Gateway of Pacific Phase 4
Demolition, New Construction, Infrastructure - 345,842 SF
Pending Verification
$88,000,000 CJ est. value
South San Francisco, CA 94080

Bell Lofts
New Construction, Infrastructure
Pending Verification
$52,000,000 CJ est. value
San Bruno, CA 94066

Sea Cloud Park S4 Synthetic Resurfacing - PK-01 - City of Foster City
Infrastructure
Conception
$800,000 est. value
Foster City, CA 94404

Last Updated 11/17/2022 07:40 AM
Project Title

Serramonte / Serra Center Signalization (911) - Town of Colma

Physical Address View project details and contacts
City, State (County) Colma, CA 94014   (San Mateo County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Demolition, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install traffic signal on Serramonte Blvd at the Serra Center entrance (Target). The project will be partially funded by a development impact fee ($26,000). Estimated project cost of $500,000 includes for the signalization of the intersection, the road realignment work at Serramonte Boulevard and Collins Avenue and removing the existing slip lane, restriping of Serramonte Boulevard to simulate the proposed lane reduction on Serramonte Boulevard, plus design and project management costs associated with the project. Capital | Streets, Sidewalks, & Bikeways 138 The elimination of the slip lane will provide a safer approach for pedestrians and bicyclists as vehicles enter Collins Avenue. The removal of the slip lane will provide a landscape area for wayward signage, gateway signage and landscaping while entering into the Serramonte Auto Row District. Another aspect of this project is to install temporary street stripping to simulate how the lane reduction on Serramonte Blvd. will perform and if the lane reduction is feasible. The restriping of the roadway will simulate the proposed lane reduction and will take two lanes of travel in each direction and reconfigure it to one lane of travel in each direction with a turn lane in the middle of the roadway. The purpose of the middle lane will provide vehicles to enter a safe area to make left hand turns into the various car dealerships and retail outlets. Likewise, vehicles exiting the various businesses along Serramonte will be able to make safe left hand turns onto the roadway and be able to enter the middle lane before merging into the oncoming traffic lane. The signalization of the Serramonte/Serra Center intersection, roadway reconfiguration roadway striping is part of the Serramonte Blvd/Collins Ave Master Plan. These improvements have been separated for the Master Plan Project (CIP#905) for potential grant funding. This project is included in the city's 2022-2027 Capital Improvement Plan (CIP). As of November 17, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Demolition.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents