Similar Projects
Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

CBJTC Precinct Road North Culvert Replacement
Results
Less than $500,000 est. value
Starke, FL 32091

CBJTC North Tank Trail Emergency Repair
Results
Less than $350,000 est. value
Starke, FL

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

CBJTC East Bay Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Washington County Concrete Drainage Features
Post-Bid
Chipley, FL 32428

CBJTC Gulfport Street Washout Repair
Results
Less than $420,000 est. value
Starke, FL 32091

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

CBJTC Mosley Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

CBJTC Prison Camp Road Washout Repair
Results
Less than $300,000 est. value
Starke, FL 32091

Windle Lane Stormwater Pond
Post-Bid
Daytona Beach, FL 32100

SE Florida Sediment Morphodynamics
Results
Everglades, Lake Worth, Miami, Palm Beach, FL 32207

Picayune Strand Restoration Project, US41 and CR92 Conveyance Features
Post-Bid
$5,000,000 to $10,000,000 est. value
Goodland, FL

Last Updated 05/21/2021 09:44 AM
Project Title

Tanglewood Drainage Improvements

Physical Address View project details and contacts
City, State (County) Sanford, FL 32771   (Seminole County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $756,467
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of drainage infrastructure along Lakemont Avenue and to regrade the slopes of the existing drainage swale on the west side of Lakemont Avenue. Coordination with both the City of Winter Park and the City of Casselberry is required as they will be performing their utility relocations concurrently with the Tanglewood Drainage Improvements on Lakemont Avenue.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents