Similar Projects
DFCM Construction-AOC Logan First District Court Facility Boilers Replacement
Alteration
Bidding
$155,165 est. value
Logan, UT 84321

DFCM Construction-Pre Qualified Mechanical-DFCM MASOB Boiler Replacement
Alteration
Bidding
$285,000 est. value
Salt Lake City, UT 84116

Mckinley Elementary School Boiler Replacement Project
Post-Bid
Tremonton, UT 84337

2020 Replaster of the Outside Dive and Splash Pools
Post-Bid
Kearns, UT 84118

H344--660 (Con) Engineering- Boiler 3Rd Party Inspection, Start-Up And Testing Services For 660-17-100 New Boiler Installation At The George E Wahlen Va Health Care System In Salt Lake City, Ut
Results
Salt Lake City, UT 84148

Canyon View Jr. Boiler Replacement
Results
Orem, UT 84097

Install and Keep HVAC and Boiler Systems
Alteration
Bidding
Midway, UT 84049

Natural Gas Boilers
Post-Bid
Spanish Fork, UT

Removal of Existing Swimming Pool Boilers and Installation of New Boilers
Results
Less than $100,000 est. value
Lindon, UT 84042

South Davis Recreation District Roof and Mechanical Replacement
Post-Bid
Bountiful, UT 84010

DFCM Construction-Pre Qualified Mechanical-W Jordan Courts Mechanical System and BAS-18251150
Results
Less than $3,000,000 est. value
West Jordan, UT 84088

Sky View High School Pool AHU and Mountain Crest High School Boiler Replacement Project
Post-Bid
Hyrum, Smithfield, UT 84335

Holladay Library Boiler Replacement
Results
Holladay, UT 84117

Willard Elementary School Boiler Replacement Project
Post-Bid
Willard, UT 84340

Roy High Boiler Replacement
Results
$150,000 to $200,000 est. value
Roy, UT 84067

Reported 03/23/2022 12:00 AM
Project Title

Mountain Crest High School Mechanical Modifications

Physical Address View project details and contacts
City, State (County) Hyrum, UT 84319   (Cache County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager - 02/16/22
Owner View project details and contacts
Architect View project details and contacts
Description

Provide lump sum bids for divisions 02000 thru 16000 for Construction phase as per Mechanical drawings and specifications. This project will begin June 6, 2022 and will occur through August 12, 2022.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents