Similar Projects
Gatewood ES Exterior Door and HVAC Upgrades
Alteration
Bidding
$2,100,000 to $2,400,000 est. value
Seattle, WA 98136

Vinland Elementary School HVAC Replacement
Alteration
Bidding
$3,400,000 est. value
Poulsbo, WA 98370

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

North Franklin School District Connell High School HVAC Replacements
Alteration
Results
Connell, Pasco, WA 99326

51st Circle HVAC Purchase and Installation
Alteration
Results
Vancouver, WA 98661

Poulsbo Middle School Building 3 HVAC Replacement
Alteration
Bidding
$550,000 est. value
Poulsbo, WA 98370

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Clallam County Courthouse VAV Replacement Project
Alteration
Results
$330,000 est. value
Port Angeles, WA 98362

YVS Main Building HVAC Repairs
Alteration
Bidding
$187,000 to $330,000 est. value
Olympia, WA

HVAC and Air Filtration Systems
Renovation, Alteration
Post-Bid
Sunnyside, WA

PPWWTF Solids Drying Heat Exchanger Repairs
Alteration
Results
$200,000 to $250,000 est. value
Edmonds, WA 98020

WCCW MSU Building Climate Control Improvements
Alteration
Bidding
$860,000 to $1,010,000 est. value
Gig Harbor, WA 98332

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

Headquarters Diesel Exhaust Removal System
Alteration
Results
$92,500 est. value
Belfair, WA 98528

Reported 01/12/2022 12:00 AM
Project Title

Cooling Tower Fill & Drift Eliminator Replacement

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98660   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

DESCRIPTION: The project includes the following work: Replacing the cooling tower fill material and drift eliminators in a GEC single row five (5) square cells control tower all as more fully described Section 01 11 00, Summary of Work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents