Similar Projects
District 2243
New Construction - 4,510,000 SF
Conception
$10,000,000 CJ est. value
Leander, TX 78641

District 2243
New Construction - 4,510,000 SF
Conception
$10,000,000 CJ est. value
Leander, TX 78641

Steward Healthcare
Renovation
Design
$200,000 est. value
Dallas, TX 75201

Texas Health Presbyterian Hospital Women's Center
New Construction - 200,000 SF
Design
$80,000,000 est. value
Denton, TX 76201

Renovation of an Existing Gastrointestinal Procedure Room at Lyndon B. Johnson Hospital
Renovation
Bidding
$400,000 est. value
Houston, TX 77026

Design/Build Services for Expansion of the Medical Examiner Facility
Renovation - 6,250 SF
Bidding
$1,500,000 est. value
Rosenberg, TX 77471

Renovate Alkek Hospital, Main Building, Floor 12
Renovation
Post-Bid
Less than $7,100,000 est. value
Houston, TX

Subcontractors for the Early Release Package, UT Austin State Hospital-Brain Health System Redesign Project
New Construction, Demolition
Post-Bid
$210,000,000 est. value
Austin, TX 73301

PET CT and NUC MED Suite Renovation
Renovation, Addition
Results
Houston, TX

Y--Reconfigure 2J Basement Floor for IT & Administration Space (VA-19-00046746)
Renovation
Results
$1,000,000 to $2,000,000 est. value
Dallas, TX 75216

Surgery Center of North Texas
New Construction - 23,000 SF
Construction
$7,500,000 est. value
Anna, TX 75409

Everest Rehabilitation Hospital
New Construction - 76,000 SF
Construction
$11,000,000 est. value
Keller, TX 76248

Covenant Children's Hospital
Renovation
Pending Verification
$5,900,000 est. value
Lubbock, TX 79410

UT MDACC Research Medical Library Building B
Renovation - 7,930 SF
Pending Verification
Houston, TX 77030

Sherman Hospital
New Construction
Conception
$150,000,000 est. value
Sherman, TX 75092

Last Updated 11/05/2021 10:41 AM
Project Title

Building 650 Renovation and HVAC Repairs, Emergency Generator Replacement, Demolition of Buildings 517, 519, 520 and 522 and BAS Upgrade

Physical Address View project details and contacts
City, State (County) Terrell, TX 75160   (Kaufman County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,214,437
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Manager-at-Risk (CMR) to provide the following services: (i) pre-construction services, such as constructability guidance, cost estimates, site evaluations, and construction schedules; (ii) upon completion of the design development phase, provide a Guaranteed Maximum Price at the election of HHSC; and (iii) perform complete construction services consistent with the construction manager-at-risk delivery process. 1. Building 650, Wing A, Floor 3 - Full Patient Floor Renovation with Infectious Patient Isolation accommodations; 2. Demolition of four facility buildings: Buildings 517, 519, 520, and 522; 3. Emergency generator improvements and / or replacements for Building 545 and additional generator upgrades for Buildings 681, 685 and 686, as the budget allows; and 4. Mechanical Building Automation System Upgrades for Buildings 537, 541, 673, 650, 725, 797, 798 and 545.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents