Similar Projects
WCSO Administration Remodel
Renovation
Post-Bid
Reno, NV 89512

Fire Station 2 Dorm Room Remodel
Renovation
Results
$275,000 est. value
Sparks, NV 89434

TMFR Station 37
New Construction
Design
Reno, NV

Carlin Fire Station
New Construction
Post-Bid
$285,000 est. value
Carlin, NV

TMFPD Station 37 Residence Remodel
Renovation
Post-Bid
$80,000 est. value
Reno, NV 89502

Construction Manager at Risk - Carson City Fire Station with Shared Facilities for Emergency Operations Project- CMAR Services
New Construction
Post-Bid
$12,000,000 est. value
Carson City, NV 89701

Fire Station Bathroom & Dorm Renovation (Fire Station Bathroom & Dorm Renovation)
Renovation
Post-Bid
$140,000 to $185,000 est. value
Henderson, NV 89002

Pahrump Valley Fire Station No 4
New Construction
Post-Bid
Pahrump, NV

Fire Station 54 Maintenance
Renovation
Post-Bid
$100,000 to $200,000 est. value
North Las Vegas, NV 89031

Carson City Fire Station with Shared Facilities for Emergency Operations
New Construction - 10,000 SF
Post-Bid
$10,000,000 est. value
Carson City, NV

Ballistic Upgrades
Renovation
Results
Las Vegas, NV 89106

Last Updated 06/13/2022 02:51 PM
Project Title

Police Department Forensic Laboratory - MF346 - City of Henderson

Physical Address View project details and contacts
City, State (County) Henderson, NV   (Clark County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Construction Documents
Bids Due View project details and contacts
Estimated Value $15,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase I Analysis - Work with consultant to analyze multiple options for new crime lab including renovation of an existing building and new construction. Phase II Implementation - Implement recommendations from MF-346 analysis through design and construction. This project is included in the city’s FY 2022-2027 Capital Improvement Program. As of June 10, 2022, construction documents is expected to be in 90% in Mid-July 2022 with construction slated to begin Fourth Quarter 2022. However, the firm timeframe has not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents