Similar Projects
Upper Brays Bayou Greenway (BR 26) - Braeburn Glen Boulevard to Eldridge Parkway
Post-Bid
$11,100,000 to $12,500,000 est. value
Houston, TX 77074

City of West University Place Pavement Leveling
Post-Bid
West University Place, TX 77005

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

Intramural Gravel Lot Conversion
Results
Houston, TX 77204

Deer Park Hike and Bike Trails - Phase 1
Post-Bid
$400,000 est. value
Deer Park, TX

Elmside/Woodchase Path
Results
$2,900,000 to $3,300,000 est. value
Houston, TX 77042

Katy Pointe Section 4 and 5 Amenities
Post-Bid
Cypress, TX

Silver Springs West Richey Road Dedication, Section One
Results
Less than $1,009,711 est. value
Houston, TX 77040

Paving and Traffic Improvements
Post-Bid
$500,000 est. value
Houston, TX

FM 1960 - Intersection Improvements
Results
Less than $13,274,738 est. value
TX

Generation Park - New Parking Lot
Post-Bid
$3,920,033 est. value
Houston, TX 77044

Neighborhood Street ReconstructionNo. 460 (Subproject 2), Ashland Street
Results
Less than $1,670,993 est. value
Houston, TX 77251

Clay Road Reconstruction
Post-Bid
$2,600,000 est. value
Houston, TX 77282

2020 Paving Improvements Project
Results
$344,000 est. value
Piney Point Village, TX 77063

Imperial Forest Section 5
Post-Bid
Houston, TX

Reported 07/13/2022 04:13 PM
Project Title

Washington Avenue Pedestrian Improvement - T-131700 - City of Houston

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Re-construction of broken curbs, gutters, broken sidewalks and removal of unnecessary gravel or concrete along Washington Avenue between Oliver and Houston Avenue. As of July 12, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents