Similar Projects
HMA Overlay, Preventive Maintenance
Infrastructure
Design
$5,104,049 CJ est. value
Richmond, IN 47374

HMA Overlay, Preventive Maintenance
Infrastructure
Design
$5,104,049 CJ est. value
Richmond, IN 47374

Peacock Road and Elstro Plaza Infrastructure
Infrastructure
Post-Bid
Richmond, IN 47374

Street Rehabilitation - Community Crossings 2021-2
Infrastructure
Post-Bid
Richmond, IN

Street Rehabilitation - Community Crossings
Infrastructure
Results
Richmond, IN

2021 Street Specifications - Center Street- West Cumberland Street to Dead-End South - Project 6
Infrastructure
Results
Dublin, IN 47327

Richmond 7 Solar Park
New Construction, Infrastructure
Construction
$6,750,000 CJ est. value
Richmond, IN 47374

Richmond 7 Solar Park
New Construction, Infrastructure
Construction
$6,750,000 CJ est. value
Richmond, IN 47374

Liberation Labs / Richmond
New Construction, Infrastructure
Pending Verification
$115,000,000 CJ est. value
Richmond, IN 47374

Blue Buffalo Expansion / Richmond
Addition, Demolition, Infrastructure - 169,000 SF
Pending Verification
$45,000,000 CJ est. value
Richmond, IN 47374

Sidewalk Replacement Project
Infrastructure
Post-Bid
$280,000 est. value
Richmond, IN

2021 Street Specifications - State Street- West Maple Street to West South Street - Project 1
Infrastructure
Results
Dublin, IN 47327

Richmond 6 Solar Park
New Construction, Infrastructure
Construction
$8,000,000 CJ est. value
Richmond, IN 47374

2022 Sewer Lining Project
Infrastructure
Post-Bid
$130,000 CJ est. value
Richmond, IN 47374

2021 Street Specifications - Johnson Street- Cumberland Street (US 40) to Delaware Street - Project 2
Infrastructure
Results
Dublin, IN 47335

Last Updated 05/15/2023 11:10 AM
Project Title

EA000A Site - Parking Lot Asphalt Repair (Student Activities/Hayes Hall)

Physical Address View project details and contacts
City, State (County) Richmond, IN 47374   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $148,550 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

A Unified Bid is requested for all work in this project, including General, Mechanical, and Electrical Construction work. Each bid must be accompanied by: o a completed Minority, Women's and Veteran's Business Enterprise Participation Plan, detailing the good faith efforts of the contractor to include minority, women and veteranowned enterprises as subcontractors or material suppliers on the Project; The Owner reserves the right to accept or reject any bid and to waive any irregularities in bidding. The Owner may consider a bid to be incomplete if it does not provide the required documentation as described in this Notice, including but not limited to the Minority, Women's and Veteran's Business Enterprise Participation Plan. The Base Bid may be held for a period not to exceed sixty days before awarding Contracts. All Alternate Bids may be held for a period not to exceed ninety days before award and incorporation into the contract by proper Change Directive. Summary of Work 1.1 All documents included in Contract Documents create the work summary in total for said project 1.2 Work Sequence should be coordinated with Owner and Customer 01 14 00 Work Restrictions 1.1 Schedule construction work between 7:00 AM to 6:00 PM on weekdays. Indicate in the Bid Documents if Work outside of this schedule is required. 1.2 The IU Construction Manager will arrange for access to be issued to the Contractor to buildings or rooms. The Contractor is required to fill out a form for the keys and is liable for the cost of rekeying if the keys are lost or not returned. All project sites are to be secured during non-work hours to prevent unauthorized access and safety hazards to project site. 1.3 Excessive noise from construction activities may require rescheduling or off hours to avoid quiet week, finals week, graduation ceremonies, or at the request of the Owner.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents