Similar Projects
Lesourdsville Camps High Bay Welding Filtration and HVAC Project
Alteration
Bidding
$700,000 est. value
Middletown, OH 45044

Construction Manager at Risk Services (CMAR) - HVAC and Weight Room Project
Renovation
Bidding
$3,577,000 est. value
Wellston, OH

HVAC Building Filter
Post-Bid
Oxford, OH

HVAC Technical Services for Forced Air Furnaces
Term Contract
Post-Bid
Cleveland, OH

Public Auditorium Music Hall Air Handling Units
Results
$950,000 est. value
Cleveland, OH 44114

Infrastructure Upgrades to ECU Plant - Chiller 4 Replacement
Results
Less than $369,500 est. value
Cincinnati, OH

Ohio University Lancaster HVAC and Energy Efficiency Improvements Phase II
Alteration
Bidding
$2,500,000 est. value
Lancaster, OH 43130

HVAC Replacements - FY2020
Post-Bid
Less than $2,800,000 est. value
Columbus, OH

OU Alden Library Air Handler Replacement Upgrades
Results
$1,020,000 est. value
Athens, OH 45701

Clear Fork Middle/High School HVAC Improvements
Alteration
Bidding
$300,000 est. value
Bellville, OH 44813

Logan County Children's Services Boiler and Chiller Replacement
Post-Bid
Bellefontaine, OH 43311

ORW HVAC Replacement
Results
Less than $1,083,000 est. value
Marysville, OH 43040

HVAC Service / Maintenance Contract
Alteration
Bidding
Moraine, OH

AHU3 Steam Coil Replacement / Repair
Post-Bid
OH

HVAC Preventative Maintenance (PM) and Repair
Results
Less than $1,074,881 est. value
Cincinnati, OH 45214

Last Updated 06/07/2022 09:05 AM
Project Title

4200 Building HVAC System Controls

Physical Address View project details and contacts
City, State (County) Colerain, OH   (Belmont County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Replace the current Trane Building Control Unit (BCU) and (5) Trane UPCM controllers, which currently operate the four air handling units and mechanical roo (boilers and chiller). 2. Integrate (if possible) the (50) existing VAV boxes into the new control system. 3. Provide a complete operating system for controlling the heating, cooling and ventilation for each of the (4) areas served by the air handling units. 4. Provide a new BACnet based operator interface for the BAS computer to provide graphics, alarms and history. 5. Provide start up and check out of new controls and controls system after installation is complete. 6. Provide a minimum, of 8 hours operator training, to on site personnel, on operations and maintenance of new controls and controls system. 7. Provide commercial standard warranty for new controls components and controls system. 8. Provide one year workmanship warranty.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents