Similar Projects
MMAC Hangar 9 Chiller Replacement - Mike Monroney Aeronautical Center (Ward 3) - City of Oklahoma City
Renovation
Conception
$750,000 est. value
Oklahoma City, OK 73169

WPA Hangar 11 Middle and High Roof - Wiley Post Airport (Ward 1) - City of Oklahoma City
Renovation
Conception
$380,000 est. value
Bethany, OK 73008

KC-46A 2-Bay Depot Maintenance Hangar
New Construction
Design
$100,000,000 to $250,000,000 est. value
Oklahoma City, OK

Repair Riser Manifold in Aircraft Maintenance Hangar B141
Renovation
Bidding
$25,000 to $100,000 est. value
Enid, OK

Airport Hangars
New Construction
Post-Bid
Lindsay, OK 73052

Air EVAC Hangar
New Construction
Post-Bid
Ardmore, OK 73401

Seminole Municipal Airport - Construct T-Hangar 20045
New Construction
Results
Seminole, OK 74868

Claremore Regional Airport - New T-Hangar
New Construction
Results
Claremore, OK 74019

Airport Hanger T1 Through T4 Bird Control
New Construction
Post-Bid
Norman, OK 73069

Taxiway and Hangar Project
New Construction, Infrastructure
Results
$1,000,000 to $1,200,000 est. value
Pauls Valley, OK 73075

Bay Depot Maintenance Hangar Tinker AFB, OK
Renovation
Post-Bid
$100,000,000 to $150,000,000 est. value

Hangar Project
Renovation
Post-Bid
$1,000,000 est. value
Pauls Valley, OK 73075

Fy25 Kc-46A 1-Bay Corrosion Control Hangar
New Construction
Post-Bid
$100,000,000 to $250,000,000 est. value
Oklahoma City, OK 73145

Construct Hangars
New Construction
Post-Bid
$300,000 est. value
Thomas, OK 73669

Reported 06/21/2022 03:30 PM
Project Title

WPA Hangar 6 Roof - Wiley Post Airport (Ward 1) - City of Oklahoma City

Physical Address View project details and contacts
City, State (County) Bethany, OK 73008   (Oklahoma County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $252,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a transportation facility in Bethany, Oklahoma. Conceptual plans call for the renovation of a transportation facility. Wiley Post Airport - Recoating of Hangar 6 roof. Estimated annual operating cost is $0. This project is included in the city's 2023 Capital Improvement Plan (CIP). As of June 17, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Aircraft Hangar, Renovation.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents