Similar Projects
Clayton Lodge Kitchen Expansion
Addition, Demolition, Infrastructure
Design
$500,000 CJ est. value
Maryville, TN 37804

RFP - 246 North Rankin Road Development
New Construction, Infrastructure
Bidding
$235,798 CJ est. value
Alcoa, TN 37701

Paving Projects
Infrastructure
Bidding
$300,000 CJ est. value
Louisville, TN 37777

Great Smoky Mountains - Road Repair and Site Work
Infrastructure
Post-Bid
$2,000,000 to $10,000,000 est. value
Tallassee, TN

Northfield Drive Stormwater Pipe Replacement Project
Infrastructure
Post-Bid
$295,000 CJ est. value
Maryville, TN 37804

Ground Base PV Array
New Construction, Infrastructure
Results
$4,879,004 CJ est. value
Louisville, TN 37777

Ground Base PV Array
New Construction, Infrastructure
Results
$4,879,004 CJ est. value
Louisville, TN 37777

Frogpond Road Subdivision
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Friendsville, TN 37737

Stone Creek Office and Warehouse
New Construction, Infrastructure - 17,099 SF
Pending Verification
$2,000,000 CJ est. value
Maryville, TN 37803

Artificial Turf Football Fields
Infrastructure
Bidding
$2,000,000 CJ est. value
Maryville, TN 37804

McGhee Tyson Airport (TYS) Terminal Apron Expansion
New Construction, Infrastructure
Post-Bid
$10,200,000 CJ est. value
Alcoa, TN 37701

North End Booster Pump Stations
New Construction, Infrastructure
Results
$1,027,963 CJ est. value
Lenoir City, TN 37772

Pellissippi Place Mixed-Use
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Alcoa, TN 37804

CVS #6359 / Alcoa (Site Work)
Infrastructure
Bidding
$200,000 CJ est. value
Alcoa, TN 37701

Springbrook Tennis Court Resurfacing and Fence Demolition and Reconstruction
Infrastructure
Post-Bid
$30,000 CJ est. value
Alcoa, TN 37701

Last Updated 05/24/2023 09:10 AM
Project Title

Photovoltaic Array

Physical Address View project details and contacts
City, State (County) Louisville, TN 37777   (Blount County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Agency's Affiliate - 05/05/23
Owner View project details and contacts
Architect View project details and contacts
Description

Description: On or about 5 May 2023 an Invitation for Bid (IFB) will be issued for ECIP Construct Ground Base PV Array on the 134th Air Refueling Wing at McGhee Tyson Air Base located in Louisville, TN. The contract duration will be approximately 270 days after issuance of the Notice to Proceed (NTP). The solicitation will be a Total Small Business Set Aside. The North American Industry Classification Code (NAICS) is 237130 with a small business standard of $45,000,000.00 The estimated constructions costs of this project will be between $5,000,000 and $10,000,000.00 A pre-bid conference/site visit will be held on or around 10 May 2023 at a location and time to be determined in the solicitation. Please do not submit request for plans and specifications as they will be listed in the upcoming solicitation. Project Description: The Tennessee Air National Guard, McGhee Tyson ANG Base, Louisville, TN has been tasked to solicit for and award a project for ECIP Construct Ground Base PV Array. The 134 ARW requires to construct photovoltaic generation and support systems install; providing on site renewable distributed electrical generation increasing energy resiliency power to McGhee Tyson Air National Guard Base. Locate and ground mount the PV arrays on-base property. Provide inverter system and performance monitoring equipment. Install meters compatible and linked to local energy management system for instantaneous and historic performance tracking. Provide additional related works as necessary to include all. There is an option to add more PV Array Panels. Proposed project will be a Firm Fixed Price contract. Your attention is directed to FAR CLAUSE 52.219-14 (c) (4) LIMITATIONS ON SUBCONTRACTING which states "By submission of an offer and execution of a contract, the Offeror /Contractor agrees that in performance of the contract the concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees" applies to this project. The bid opening date is scheduled for on or about 9 June 2023. Actual dates and times will be identified in the solicitation. All dates in this announcement are estimates. Interested offerors must be registered in SAM. To register go to: https://www.sam.gov/portal/public/SAM/ . You will need your UEI number to register. Instructions for registering are on the web page. The solicitation and associated information and the plans and specifications will be available only from the SAM.GOV website on- line at sam.gov. SAM.GOV is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with SAM.GOV before accessing the system. (Please note the registration for access to the secure site takes approximately 15 business days. PLAN ACCORDINGLY) Reference paragraph 4.7 of the Vendor Guide for instructions to obtain a MPIN to retrieve the specification and drawing documents. Contractors who do not already have a MPIN are advised that the normal processing is 7 to 12 business days to obtain a MPIN password that will give them access to the plans and specifications, which are located in the controlled access location on SAM.GOV. See video in vendor guide at 3.3 on advanced functions for other information. Bidders/offerors who have registered with SAM.GOV must access the data for this solicitation with their MPIN. Bidders/offerors cannot log into the SAM.GOV home page and search for data. DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to https://sam.gov/ for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for an offerors inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. All inquiries must be in writing, preferable via email to the persons specified in the solicitation. All answers will be provided in writing via posting to the web. Place of performance is Louisville, TN. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents