Similar Projects
Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

Tully Road Ballfields Dog Park Improvements - City of San Jose
Renovation, Infrastructure
Conception
$500,000 est. value
San Jose, CA 95121

Icon / Echo
New Construction, Infrastructure - 525,000 SF
Design
$600,000,000 CJ est. value
San Jose, CA 95113

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

Cold Plane AC, Paving with RHMA, Upgrade Median CB and Curb Ramp
Infrastructure
Bidding
$51,000,000 CJ est. value
San Jose, CA 95110

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Asbestos and Lead Abatement Services
Term Contract, Alteration
Results
$200,000 est. value
San Jose, CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Kifer Senior Housing
New Construction, Infrastructure
Construction
$13,500,000 CJ est. value
Santa Clara, CA 95051

Eterna Tower
New Construction, Infrastructure - 1,500 SF
Pending Verification
$37,000,000 CJ est. value
San Jose, CA 95113

Hemlock Avenue Mixed Use Development
New Construction, Infrastructure - 11,910 SF
Pending Verification
$24,000,000 CJ est. value
San Jose, CA 95128

Route 87/Taylor Bike/Ped Improvements - City of San Jose
Infrastructure
Conception
$532,000 est. value
San Jose, CA 95110

Main Street Milpitas
New Construction, Infrastructure - 350,257 SF
Design
$16,300,000 CJ est. value
Milpitas, CA 95035

Last Updated 12/09/2022 04:07 PM
Project Title

Saratoga Creek Restoration Project Repost

Physical Address View project details and contacts
City, State (County) San Jose, CA 95113   (Santa Clara County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Environmental, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,876,383 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The consultant will implement the already designed Saratoga Creek Restoration Project, installing approximately 18,000 native plants and an irrigation system to support them into the approximately 3.7-acre site over a three-year period (three phases). Contract elements include mobilization/demobilization for each phase, planting area preparation, irrigation system installation, seeding, container planting, pole cutting installation, installation of revegetation signs, and plant establishment maintenance. The resulting contract is subject to prevailing wages as described below: a. This ITB includes Project Work Areas ("Work Areas") where prevailing wages apply. b. For the billing classifications subject to prevailing wages, Valley Water will not accept a proposal or enter into an agreement with a Bidder, without proof that the Bidder and its subcontractors (for which billing classifications subject to prevailing wages apply) are registered with the California Department of Industrial Relations ("DIR") to perform public work under Labor Code - 1725.5, subject to limited legal exceptions. Please visit the DIR website for more information: Electronically. c. Also note that the Bidder is required to be registered and prepared to submit proof of registration with the DIR, whether the Bidder's firm is doing work where prevailing wages apply. Bidder will also submit proof of registration with the DIR only for those subcontractors performing work where prevailing wages apply. d. For the Project Work Areas where the prevailing wages apply, Contractor shall comply with the State of California's General Prevailing Wage Rate requirements in accordance with California Labor Code, 1770, and all Federal, State, and local laws and ordinances applicable to the Work. The prevailing wage for the locality in which the Work is to be performed is set by the Department of Industrial Relations ("DIR") as outlined in the applicable Prevailing Wage Determination at Electronically. Pre-Bid Meeting No Online Q&A Yes Q&A Deadline 11/16/2022 4:00 PM (PST) License Requirements C-27 Bid Valid Liquidated Damages Estimated Bid Value Start/Delivery Date - December 2022 Project Duration - 3 years with possible two-one year extensions

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents