Similar Projects
C--Architect-Engineer (A-E) and Professional Services IDIQ
Design

A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

Professional Consulting Services - Master Planning
Alteration
Bidding
CO

On-Call Municipal Planning Services
Infrastructure
Bidding
Severance, CO

Indefinite Delivery/Indefinite Quantity (IDIQ) procurement to acquire Architect-Engineer (AE) Services under individual task orders throughout the Mobile District Area of Responsibility (AOR) to support Mobile District Planning and Environmental Division
Post-Bid

Miscellaneous Architect/Engineer Services in Support of Facilities Programs
Post-Bid
$1,000 to $3,000,000 est. value

C--CO, AZ and NM A/E Professional Services IDIQ
Results
$2,500 to $5,000,000 est. value

A/E Fire Protection Engineering IDIQ
Results

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Facility Master Planning Project
New Construction
Bidding
Greeley, CO

Water Tank Inspections, OCONUS and CONUS
Post-Bid
$10,000 to $5,000,000 est. value

Highway and/or Bridge Design and Engineering Services
Results
Less than $80,000,000 est. value

Full Service Design IDIQ
New Construction
Design

Indefinite Delivery Contract (Idc) for Architect- Engineering (A-E) Services for Hydrographic and Topographic Surveys
Renovation, Term Contract
Bidding
$1,980,000 to $3,300,000 est. value
San Francisco, CA 94102

Traffic Impact Study
Post-Bid
Greeley, CO 80634

Last Updated 07/28/2021 02:24 PM
Project Title

12th Street Storm Outfall: Phase 1B - Outfall to 12th Street and Water Quality Pond

Physical Address View project details and contacts
City, State (County) Greeley, CO   (Weld County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of design work includes the following anticipated scope: • 13’ x 6’ Reinforced Concrete Box Culvert storm trunk line (approximately 1400 LF). • Storm drain outfall into the Cache la Poudre River • Removal of approximately 14,000 CY of sediment in the Cache la Poudre River and final grading, as identified in Anderson’s Poudre River Flood Mitigation Plan (2018). This is expected to be a maintenance activity; geomorphic analysis and additional stream restoration efforts are not expected to be within the scope of the project • Scour protection at storm outfall and of Highway 85 piers and abutments • Water Quality pond and outlet structure on existing City property • Replacement of storm infrastructure in 2nd Avenue and 10th Street intersection • Replacement of storm infrastructure in 2nd Avenue and 12th Street intersection, intercepting existing 48” Storm main. • Coordination with Phase 1A design of Water and Sanitary Sewer Relocations

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents