Similar Projects
Replacement Heaters at the Water Treatment Plant
Bidding
Harbor Beach, MI 48441

Replacement Boilers - Chippewa Hills School District
Bidding
Remus, MI 49340

Storm Water Mechanical and Electrical Systems Replacement Project
Post-Bid
Harrison Township, MI 48045

Construction Work for an Energy Performance Contract for Electric/Plumbing/ Mechanical/Build/Appliances
Post-Bid
Saint Joseph, MI 49085

Boiler Replacement for Columbiaville Elementary
Results
Less than $173,250 est. value
Columbiaville, MI 48463

Boiler Controls Upgrade
Results
Dollar Bay, MI 499220350

Boiler Replacements
Bidding
Munising, MI

Mechanical Improvement Projects Services
Post-Bid
Grand Rapids, MI

East McNair Steam Trap Replacement
Results
Less than $185,849 est. value
Houghton, MI 49931

Pump Station Maintenance Program
Bidding
Southfield, MI

Boiler Pre-Pricing Package
Post-Bid
Walled Lake, MI

Replace Bldg. 570 Boiler "Mulligans"
Results
$25,000 to $100,000 est. value
Harrison Township, MI 48045

2021 Mechanical System Improvements
Bidding
Coopersville, MI

Stevenson High School Mechanical Upgrades
Post-Bid
Sterling Heights, MI

DNR Escanaba Field Office Boiler Replacement
Results
Less than $83,955 est. value
Gladstone, MI

Last Updated 07/31/2020 08:30 AM
Project Title

Mechanical Equipment Upgrades

Physical Address View project details and contacts
City, State (County) Davison, MI 48423   (Genesee County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $135,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will consist of Mechanical Equipment Upgrades at the High School, Middle School and Hahn Intermediate. This work will bid as a single work category and will be a single prime contract for the low qualified bidder.The scope of work will include (but not limited to) the following: Domestic Hot Water Boilers Storage Tanks Expansion Tanks Domestic Hot Water Circulation Pumps Heating Hot Water Circulation Pumps Concrete equipment pads Demolition of existing equipment Electrical

Details

Division 02 - Existing Conditions, Physical Decontamination, Mechanical Filtration Decontamination.
Division 22 - Plumbing, Domestic Water Heat Exchangers, Instantaneous Domestic Water Heat Exchangers, Heating-Fluid-in-Coil, Instantaneous Domestic Water Heat Exchangers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers, Heating Boiler Feedwater Equipment.
Division 42 - Process Heating, Cooling, and Drying Equipment, Commissioning of Process Heating, Cooling, and Drying Equipment, Process Heating Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents