Similar Projects
Deer Creek Plant Improvements - 20600 North Portland Avenue (Ward 8) - City Of Oklahoma City
Renovation
Conception
$1,546,000 est. value
Edmond, OK 73012

Kenwood Hills Water System Improvements- Construction - WL1903 - City of Broken Arrow
Renovation
Conception
$428,000 est. value
Broken Arrow, OK

Water Reclamation Facility Dewatering Centrifuge Replacement - WW0326 - City of Norman
Renovation
Design
$2,500,000 CJ est. value
Norman, OK 73072

Newcastle Wastewater Treatment Plant Improvements
Renovation
Bidding
$25,000,000 CJ est. value
Newcastle, OK 73065

Wastewater Treatment Plant Fence & Site Improvements
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Claremore, OK 74017

FY '22 Water Pollution Control Capital Equipment Replacements
Alteration
Post-Bid
Tulsa, OK

2021 CDBG Wastewater Treatment Improvements
Renovation
Post-Bid
$500,000 CJ est. value
Grandfield, OK 73546

Kingfisher WWTP Rehabilitation
Renovation
Results
Kingfisher, OK

Holdenville Wastewater Treatment Plant Improvements
Renovation
Results
Holdenville, OK 74848

Hochatown - Offsite Improvements - WP #1 - Access Roadway & Facility Maintenance Building
New Construction, Infrastructure
Construction
$5,000,000 CJ est. value
Hochatown, OK 74728

Wastewater Treatment Plant Improvements South Canadian Wastewater Treatment Plant
Renovation, Infrastructure
Post-Bid
$203,529,800 CJ est. value
Oklahoma City, OK 73170

Lynn Lane Wastewater Treatment Plant Disinfection Improvements
Renovation
Results
Broken Arrow, OK 74012

Lynn Lane WWTP Filter Press Replacement Procurement
Renovation
Post-Bid
$610,000 CJ est. value
Broken Arrow, OK 74011

Lynn Lane WWTP East Clarifier Rehabilitation
Infrastructure
Results
Broken Arrow, OK 74011

Adams Creek Basin Study - City of Marianna
Infrastructure
Post-Bid
$1,415,000 CJ est. value
Broken Arrow, OK 74012

Last Updated 03/24/2023 09:39 AM
Project Title

FY'23 Northslope Capital Equipment Replacements

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74117   (Tulsa County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $467,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing all tools, materials and labor and performing the work necessary to be done in the construction of the following: PROJECT NO. WPC 23-3 FY23 NORTHSLOPE CAPITAL EQUIPMENT REPLACEMENTS The entire cost of the improvements shall be paid from Account No. 7503392-544003. Bids will be accepted by the City Clerk from the holder of valid pre-qualification certificates from the City of Tulsa in one or more of the following classifications: A or D Drawings, specifications and contract documents for construction of said public improvements of the said project have been adopted by the Mayor of said City. A bidder may exclude from his bid appropriate sales taxes which he will not have to pay while acting for and on behalf of the Tulsa Metropolitan Utility Authority. See Contract Article IIB. A Certified or Cashier's Check or Bidder's Surety Bond, in the sum of 5% of the amount of the bid will be required from each bidder to be retained as liquidated damages in the event the successful bidder fails, neglects or refuses to enter into said contract for the construction of said public improvements for said project and furnish the necessary bonds within thirty days from and after the date the award is made. The bidder to whom a contract is awarded will be required to furnish public liability and workmen's compensation insurance; performance, statutory, and maintenance bonds acceptable to the Authority, in conformity with the requirements of the proposed contract documents. The performance, statutory, and maintenance bonds shall be for one hundred percent (100%) of the contract price.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents