Similar Projects
Desert Meadows Pre-K Building and Additional Parking
Addition, Alteration
Design
Laveen, AZ 85339

Heritage District ADA Sidewalk Improvements
Infrastructure
Bidding
$797,323 est. value
Gilbert, AZ

Buckeye Park-N-Ride Expansion
Infrastructure
Bidding
$2,493,119 est. value
Goodyear, AZ 85395

Zoo Parking Lot - Papago Park
Post-Bid
Phoenix, AZ 85008

The Paseo
Post-Bid
Gilbert, AZ 85296

The Shores North ADA/ABA- Construction of a Sidewalk
Results
Less than $25,000 est. value
Phoenix, AZ

Y--Painted Rock CG - ADA Concrete
Results
Phoenix, AZ 85027

American Disabilities Act Project Upgrades - Phase II
Post-Bid
$500,000 to $750,000 est. value
Chandler, AZ

Hores North ADA/ABA- Construction of a Sidewalk Slab and Parking Slab
Results
Phoenix, AZ 85004

Parking Lot Demolition
Demolition
Post-Bid
AZ

Asphalt Patching and Miscellaneous Repair
Term Contract
Results
Less than $1,000,000 est. value
Gilbert, AZ 85296

Ocotillo Road Improvements - 148Th To Greenfield
Term Contract, Infrastructure
Post-Bid
$1,474,900 est. value
Gilbert, AZ

BHS CHS HHS Parking Lots
Results
Less than $4,400,000 est. value
Chandler, AZ 85249

Jackrabbit Trail and Indian School Road Intersection Improvements
Results
$783,000 est. value
Buckeye, AZ 85326

Pima Dynamite Trailhead Improvements
Results
$2,561,000 to $2,831,000 est. value
Scottsdale, AZ 85262

Last Updated 09/15/2021 06:23 PM
Project Title

Residential Streets Overlay G06C, G08A, J05A and K08A

Physical Address View project details and contacts
City, State (County) Mesa, AZ   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,200,000 to $5,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract shall be for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work:Mill and overlay four (4) City of Mesa Transportation Quarter Sections. Work includes removing and replacing concrete ramps, aprons, sidewalks, driveways and valley gutters to meet current A.D.A. and safety guidelines. Place a 1½” lift of ½” densely graded PMTR per plans and specifications in each quarter section. Quarter Section G08C is located near Brown and Lindsay Roads. Quarter Section G08A is located near Broadway and Gilbert Roads. Quarter Section J05A is located near McKellips and Greenfield. Quarter Section K08A is located near Broadway and Higley Roads. The contractor will be required to provide traffic control and extensive public notification to coordinate the project improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents