Similar Projects
Travelers Rest Regional Pump Station
Renovation
Bidding
Greenville, SC

O Dell Street Lift Station and Sewer Line
Infrastructure
Bidding
Liberty, SC 29657

Woodside Pump Station Upgrade
New Construction
Post-Bid
North Charleston, SC 29405

Haddon House Pump Station Upgrade
Post-Bid
Less than $550,000 est. value
Richburg, SC

Pump Station 002 Replacement
New Construction
Results
Goose Creek, SC

Phase 2 - Kraft-Heinz Ground Storage Tank and Pump Station
Results
Newberry, SC

Gravity Sewer Greenlawn Drive to Burnside 1 Pump Station Phase 2 (SS7258) CDBE
Infrastructure
Bidding
Columbia, SC

Central Plant Pump Station Motor Replacement
Post-Bid
Conway, SC 29526

Dunwoody Oaks Pump Station Elimination
Results
Greenville, SC

SIUC WWTP Effluent Storage and Pumping Improvements
Infrastructure
Bidding
Seabrook Island, SC

Pump Station 7 Repairs
Post-Bid
$100,000 to $300,000 est. value
Hollywood, SC 29449

South Greenville Enterprise Park Pump Station
Results
Greenville, SC 29673

Upgrade Transfer Station Sewage Pump Station
New Construction
Bidding
Myrtle Beach, SC

Lake Rabon Raw Water Pump Station Surge Tank Improvements
Post-Bid
$600,000 to $700,000 est. value
Laurens, SC

Northside Drive Pump Station Elimination
Results
North Charleston, SC 29419

Last Updated 06/10/2021 09:37 AM
Project Title

Lift Station Upgrade

Physical Address View project details and contacts
City, State (County) Clover, SC 29710   (York County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Lift station upgrade at Bethany Elementary School.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents