Similar Projects
Owners Rep for New Construction/Cap Improvements
Design
CO

Facility Maintenance Construction IDIQ
Term Contract
Design
$5,000,000 est. value
Loveland, CO 80537

On-Call Professional Services
Term Contract
Bidding
$150,000 CJ est. value
Peyton, CO 80831

RFP Design -Historic Preservation Project
Term Contract
Bidding
Thornton, CO 80229

Refurbish HVAC and Mechanical Equipment
Term Contract
Sub-Bidding
Colorado Springs, CO 80910

RFQ D/B - Multiple Award Task Order Contract (MATOC) Veterans Integrated Service Network (VlSN 19)
Term Contract
Sub-Bidding
$5,000,000 CJ est. value
Denver, CO 80202

Maintenance Services for Wynkoop Plaza for the Regional Transportation District
Post-Bid
Denver, CO

Grand Valley Vault Toilet Pumping Multi-Year - GMUG
Post-Bid
Grand Junction, CO

Portable Latrines (52 Each)
Results
Fort Carson, CO

Medicine Bow-Routt National Forest, Hahns Peak/Bears Ears Ranger District Vault Toilet Cleaning
Results
Steamboat Springs, CO 80487

RFP - New Fire Station 6
Term Contract
Pending Verification
Pueblo, CO 81001

RFQ - Clermont Underground Storage Tank Inspection and Testing - 554
Term Contract
Pending Verification
Denver, CO 80220

Underwater Inspection, Maintenance and Repair Services
Term Contract
Sub-Bidding
Thornton, CO 80229

Pest Control Services (2021)
Term Contract
Post-Bid
Aurora, CO

RWHTF and NTP Window Washing
Term Contract
Results
Brighton, Denver, CO 80229

Last Updated 10/08/2022 09:03 AM
Project Title

District Wide Carbon Monoxide Detectors Installation Project

Physical Address View project details and contacts
City, State (County) Littleton, CO 80120   (Arapahoe County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Install Carbon Monoxide Detectors in all LPS school and district sites based on the attached architectural drawings. Contractor to supply Carbon Monoxide detectors using the data sheet attached (No Substitutions Allowed). The data sheet indicates the requirements of the detectors by highlighting the specifications in blue. All work must be guaranteed for a minimum of one year for all parts and labor. The Project oversight must be supervised by one NICET Level 2 Supervisor and one licensed journeyman electrician to ensure accuracy of installations. Contractor must integrate the carbon monoxide detectors to our work stations in the District Office. The project must be completed, approved by the city, and tested no later than August 1, 2023 Question Acceptance Deadline 10/11/2022 04:00 PM EDT General Requirements Bid Deposit Required Employee Background Checks Required FOB Destination Installation Required Insurance Required Security Badges Warranty Information Required Award Requirements - Reserve Rights to Award by Line Item Bid Bond 5 % Performance Bond 100 % Labor and Materials Bond 100 % Purchase Type : One Time Only- Delivery Date:by August 1, 2023 - see schedule Additional Bidding Instructions REQUIRED ATTACHMENTS 1. Bid Guaranty 2. List of Subcontractors (required within 24 hours of bid opening) 3. Signed Certification Statement Regarding Illegal Aliens (see attached) 4. Signed Criminal Records Check Certification (see attached) 5. Certificate of Insurance 6. Signed Acknowledgment and Attestation Form (see attached) 7. W-9

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents