Similar Projects
Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

Taco Bell #458047 / Shelby
New Construction, Infrastructure - 2,287 SF
Bidding
$700,000 CJ est. value
Shelby, NC 28152

Taco Bell #458047 / Shelby
New Construction, Infrastructure - 2,287 SF
Bidding
$700,000 CJ est. value
Shelby, NC 28152

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Asphalt Pavement Repair In Cleveland & Gaston Cos.
Term Contract, Infrastructure
Post-Bid
Less than $5,000,000 est. value

Grading, Drainage, Paving and Structure
Infrastructure
Results
NC

On-Call Patching, Paving and Milling
Infrastructure
Results

Cumberland Drive Stormwater Replacements
Infrastructure
Construction
$18,458 CJ est. value
Shelby, NC 28150

Cannon 35
New Construction, Infrastructure
Pending Verification
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Cannon 35
New Construction, Infrastructure
Pending Verification
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Dixon School Road Residential Subdivision
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Kings Mountain, NC 28086

Replacing Existing Pipe with 84" Aluminum Pipe Culvert
Infrastructure
Bidding
$600,000 CJ est. value
Casar, NC 28020

AST, Double Seal on Various Secondary Routes
Infrastructure
Results

Pinnacle Park
New Construction, Infrastructure - 925,740 SF
Design
$140,000,000 CJ est. value
Kings Mountain, NC 28086

Last Updated 10/07/2022 02:07 PM
Project Title

Maco Addition

Physical Address View project details and contacts
City, State (County) Shelby, NC 28150   (Cleveland County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $4,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 7, 2022 the project is in planning stage. State funding was recently awarded. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but may begin in the beginning of 2023.

Details

7,800 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents