Similar Projects
NC A and T Craig Hall Fire Suppression Improvements
Infrastructure
Bidding
Greensboro, NC

15" Rcp Class 3 Pipe
Post-Bid
Greensboro, NC 27402

Water and Sewer Maintenance 2021-2022
Post-Bid
High Point, NC

Forest Oaks Loop Water Line Extension
Results
Greensboro, NC

Mechanical Joint Wedge Valves
Results
Greensboro, NC 27401

Montlieu Avenue Roadway and Utility Improvements
Post-Bid
High Point, NC 27260

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

East State Ave Water and Sewer PH-2
Post-Bid
$639,420 est. value
High Point, NC 27262

Liberty Road Water and Sewer Improvements Phase I
Results
Greensboro, NC 27402

4 and 6 Inch Max Adaptor Couplings
Post-Bid
Greensboro, NC

Back Flow Devices Testing, Repair, Replacement and Re-Testing
Results
Greensboro, NC 27401

2 Aluminum Weather Heads
Post-Bid
Greensboro, NC

Water and Sewer Maintenance 2020-21
Results
High Point, NC 27261

Repair Clamps
Post-Bid
Greensboro, NC

General Water and Sewer Improvements
Results
High Point, NC 27260

Last Updated 06/29/2021 04:13 PM
Project Title

Reedy Fork Water Line Extension and Sewer Outfall Contract

Physical Address View project details and contacts
City, State (County) Greensboro, NC   (Guilford County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work in this contract generally consists of installation of 6,822 linear feet of 24-inch ductile iron sanitary sewer outfall line, by open cut, and bore and jack. Additionally, the work consists of the Installation of approximately 6,249 linear feet of 24-inch DI water line and appurtenances with 5,349 feet installed by open cut, and 900 linear feet of 24-inch TR Flex DI water line installed by directional drill, connecting to existing water lines near the intersections of Summit Avenue and Reedy Fork Parkway and Brown Summit Road and Chickasha Drive.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents