Similar Projects
East Miller Road Expansion - City of Republic
Infrastructure
Conception
Less than $1,000,000 est. value
Republic, MO 65738

Pavement Replacement
Infrastructure
Bidding
$2,000,000 to $2,500,000 est. value
Lebanon, MO 65536

Pavement Resurfacing
Infrastructure
Bidding
$5,000,000 to $7,500,000 est. value
Edina, MO

2021 Road Improvements
Post-Bid
Indian Point, MO

Parks Asphalt Paving
Infrastructure
Post-Bid
Foristell, MO 63348

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

2021 Intermediate Maintenance Program
Results
Gladstone, MO

2022 Chip and Seal
Infrastructure
Bidding
$150,000 est. value
Chillicothe, MO

Pavement Crack Filling, Patching, Resealing, and Restripping Paved Surfaces
Infrastructure
Post-Bid
Bourbon, MO 65441

2021 Mill, Mat and Asphalt Overlay Program
Results
Festus, MO

Shelby Road Phase II Improvements
Infrastructure
Bidding
$221,980 est. value
Poplar Bluff, MO 63901

Street Repairs
Infrastructure
Post-Bid
La Belle, MO

Farm Road 115 and State Highway EE Roadway Improvements
Results
Springfield, MO

63rd Street Reconstruction - Woodland Avenue to Prospect Avenue
Infrastructure
Post-Bid
Kansas City, MO 64121

Pavement Repairs at District Transportation Building
Results
Grandview, MO 64030

Last Updated 07/01/2022 07:47 AM
Project Title

2022 Street Preservation Project

Physical Address View project details and contacts
City, State (County) Raymore, MO   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,160,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

60000 sq. yds. of full width milling 6750 tons of 2" Type 3 Recycled overlay Tack oil is to be Ultra Tack, Trackless Tack NTSS-1HM manufactured by Black ledge applied at the residual rate of .06 gal/sq. yd. CAT-TAC trackless tack manufactured by Hunt Refining applied at the same rate, or other approved trackless tack oil. Paving will not begin until the tack has broken. Milled surface is to be cleaned by a vacuum sweeper immediately prior to tacking. 1597 tons of full depth patching, Type 1 Recycled asphalt. Type II can be used on Hu Bach Hill, including surface. 2000 linear feet of deep crack repair on 18 streets. 10000 pounds of crack seal on two thoroughfares prior to micro surface 34980 sq yards of Type II micro surface on two thoroughfare streets; Fox ridge and Lucy Webb. Aggregate is to be steel slag. Re-striping two thoroughfare streets after micro surfacing. Install three, Pave way Systems, brick pattern crosswalks with 6" wide, white, thermoplastic borders. Asphalt is to be milled and overlaid 50 feet either side of the centre of the crosswalks prior to the crosswalk being installed. See the crosswalk on Municipal Circle at Centre review as an example. Provide traffic control that meets MUTCD standards for all phases of the project. See map for specific streets.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents