Similar Projects
Movement School East
Addition
Conception
Charlotte, NC 28212

Hope Montessori School
New Construction - 2,382 SF
Conception
$500,000 to $1,000,000 CJ est. value
Matthews, NC 28104

York Elementary
Design
NC

Telra Institute Charter School
New Construction
Design
Charlotte, NC 28270

Tabor City Pre-Kindergarten - Eighth Grade School
Renovation
Bidding
$23,000,000 est. value
Tabor City, NC 28463

School Nutrition Cafeteria Design and Furnishings
New Construction, Alteration
Bidding
Whiteville, NC

Bonnie Cone Leadership Academy
New Construction
Sub-Bidding
Huntersville, NC 28078

Subcontractors - New Es Hidden Valley, Jw Grier, Newell Relief Project
Renovation - 102,000 SF
Sub-Bidding
$34,697,022 est. value
Charlotte, NC 28263

E-41 Apex Friendship Elementary School
New Construction - 129,790 SF
Post-Bid
Apex, NC 27502

Lansdowne Elementary School
New Construction - 204,000 SF
Post-Bid
Charlotte, NC 28270

CM at Risk Selection - Two New Elementary Schools, One New High School, and One Middle School Renovation/Replacement
Renovation
Results
NC

Efland-Cheeks Elementary School Renovation
Renovation
Results
Efland, NC 27243

Crosscreek Charter School
New Construction - 39,000 SF
Construction
$5,955,000 est. value
Louisburg, NC

Thales Academy at Chatham Park
New Construction - 54,284 SF
Construction
$4,092,533 est. value
Pittsboro, NC 27312

Valle Crucis School
New Construction
Pending Verification
Sugar Grove, NC 28679

Last Updated 10/06/2021 10:15 AM
Project Title

Fremont Elementary School Construction

Physical Address View project details and contacts
City, State (County) Fremont, NC 27830   (Wayne County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $23,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The New Elementary School will have an enrollment of 750 students with core spaces for 900. The approximate square footage for the facility will be 118,000 square feet.

Details

Elementary School, 118,000 SF New Construction, Building.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents