Similar Projects
Collection System Extension Nw Hickory
Bidding
Hickory, NC

Creative Services for Storm Water
Term Contract
Bidding
Charlotte, NC

Maple Street/Merritt Street Water Improvements Project
Post-Bid
Mount Airy, NC 27030

South Main Street and Southern Avenue Stormwater Improvements
Post-Bid
$893,000 est. value
Raeford, NC 28361

Bethel Drive Trenchless Pipe Repair
Results
Salisbury, NC 28144

Storm Drainage Improvements
Results
Greensboro, NC 27401

2021 Disaster Response Emergency Construction Services
Term Contract
Bidding
Less than $500,000 est. value
Jacksonville, NC

High School Storm water Improvement Project
Post-Bid
Charlotte, NC 28208

Stanton Drive Stormwater Replacement
Results
Shelby, NC 28151

On-Call Stormwater Control Measure Repair Services
Bidding

Rempac Flood Mitigation
Post-Bid
Lumberton, NC 28358

Stormwater Replacement Project at 422 Carolina Avenue
Results
Shelby, NC 28151

Repair Culvert Cross Street (20-0017)
Post-Bid
$100,000 to $250,000 est. value
Camp Lejeune, NC 28547

2020 Stormwater Infrastructure Repairs
Results
Less than $321,583 est. value
Durham, NC

System A Storm Drain Improvements Project
Post-Bid
Harrisburg, NC 28075

Last Updated 08/20/2020 10:25 AM
Project Title

Clay Ridge Storm Drain Repair

Physical Address View project details and contacts
City, State (County) Holly Springs, NC 27540   (Wake County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for the Clay Ridge Stromdrain Repair project consist of the removal and replacement of approximately 256 LF of size 24” RCP stormdrain pipe, and associated structures. The proposed construction site is located on or between private properties in The Oaks of Avent Acres neighborhood in Holly Springs, starting between the two residences of 204 and 208 Dutch Hill Road and going south from there to end between 104 Clay Ridge Way and 210 Bottle Neck Trail

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents