Similar Projects
CSFD Complex Carpet Replacement
Alteration
Bidding
Colorado Springs, CO 80910

Jail Shower Flooring Replacement
Alteration
Bidding
Greeley, CO 80631

Flooring Replacement - Rifle Campus
Post-Bid
Rifle, CO

AVRC Floor Repair
Post-Bid
Rocky Ford, CO 80523

CU South 1st Great Hall Renovation Paint / Carpet
Results
Less than $50,000 est. value
Aurora, CO 80045

Mercury Removal Services Package 02
Results
Colorado Springs, CO 80905

Hardwood Synthetic Sports Flooring
Post-Bid

Mercury Removal Services Package 01
Results
Colorado Springs, CO 80905

Cardio Equipment and Flooring
Post-Bid
Firestone, CO

CTCF Kitchen Floor Replacement
Results
$750,000 est. value
Colorado Springs, CO

Michener Plaza Waterproofing
Post-Bid
Less than $100,000 est. value
Greeley, CO 80639

Johannsen Support Services Center West Wing Carpet, Windows and Lighting
Results
Less than $72,365 est. value
Fort Collins, CO 80521

OAAA, 2010, BAFB Building 1500 Restroom Floor Tile
Post-Bid
Aurora, CO 80112

Aurora History Museum Exterior Site Improvements
Results
$175,000 to $225,000 est. value
Aurora, CO 80012

Anti-Fatigue Pharmacy Floornig
Post-Bid
Aurora, CO 80011

Last Updated 10/21/2021 02:55 AM
Project Title

Multi-Purpose Room Floor Replacement

Physical Address View project details and contacts
City, State (County) Glenwood Springs, CO 81601   (Garfield County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Colorado Mountain College’s Glenwood Center Campus located at 1402 Blake Ave., Glenwood Springs, CO is requesting quotes from qualified firms and/or individuals to provide all labor and materials necessary for the completion of the removal and replacement of approximately 2,750 square feet of multi-purpose room flooring. Specification: 1. Contractor is responsible for confirming the amount of square feet. 2. 2 1/4" second grade maple MMFA stamped for use in public institutions 3. Bid to include all plywood, sleeper pads for floating sub-floor and any other materials necessary. 4. Demo existing basketball court due to water damage, prep sub-floor, set fans to dry any residual moisture 5. Install and staple down new sub-floor with floating application 6. Sand finish, apply 4 costs of commercial grade finish – sheet to be determined. 7. CMC desires to keep the removed existing flooring for repurposing. Please include whether or not this is possible and if there is a cost difference associated with CMC keeping the existing flooring.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents