Similar Projects
Last Updated | 10/17/2022 09:07 AM |
Project Title | Lost Creek Chaining Project 2022 |
Physical Address | View project details and contacts |
City, State (County) | Richfield, UT 84701 (Sevier County) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Environmental, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $210,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Division of Wildlife Resources is in need of Chaining Services in the Lost Creek Area of the Fishlake National Forest. Pursuant to the Utah Procurement Code, participation on this solicitation is limited to prequalified contractors only. Bids or quotes submitted by a non-prequalified contractor will not be considered. If you are not on the current Pre-approved/Pre-qualified Rangeland Vendor list for the State of Utah, please do not submit a bid. The bid opening for this solicitation will not take place in person This contract will result in one purchase order contract award to the lowest cost responsive and responsible bidder. The State of Utah Division of Purchasing is the issuing procurement unit and State of Utah Division of Wildlife Resources is the conducting procurement unit for this IFB (referred to as the State). The reference number for this IFB is Solicitation #KL23-50. This solicitation number must be referred to on all bids, correspondence, and documentation submitted to the State relating to this IFB. Failure to attend the site visit shall result in the disqualification of any bidder that does not have an authorized representative attend the entire duration of the mandatory site visit. This includes not taking calls/text during the site visit. Phones may be used to take pictures. All discussion not related to the site visit must be done after the site visit as to not be a disturbance during the site visit. An attendance log will be maintained including the name of each attendee, the entity the attendee is representing, and the attendees contact information, minutes of the site visit, and copies of any documents distributed by the conducting procurement unit to the attendees and shall be published as an addendum to the solicitation. Any verbal modifications made to any of the solicitation documents during the mandatory site visit shall be reduced to writing and will be published as an addendum to the solicitation. Question Submission Close Date 10/17/2022 2:00 PM MDT |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |