Similar Projects
Water System Improvements
New Construction
Bidding
$9,255,000 est. value
Fairmont, WV 26554

Water Tanks Demolition Project
Demolition
Bidding
Morgantown, WV

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Water System Improvements
Post-Bid
Less than $1,921,000 est. value
Augusta, WV 26704

Replace Product Recovery Tank
Results
$250,000 to $500,000 est. value
Martinsburg, WV 25405

Water Storage Tank Upgrades
Results
McMechen, WV

Contract #2 – Tank Upgrades
Results
Clarksburg, WV 26422

Cumberland Heights Water Storage Tank
Results
New Cumberland, WV

Contract 2 - Water Tank Rehabilitation
Results
Cowen, WV

Water System Improvements - Cut Off Water Storage Tank and Pump Station - Contract 3
Results
$842,400 est. value
New Creek, WV 26743

Last Updated 04/09/2021 04:41 PM
Project Title

Proposed Tank Replacement - Contract 2

Physical Address View project details and contacts
City, State (County) Paden City, WV 26157   (Wetzel County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 LS Mobilization/Demobilization, 1 LS Erosion and Sediment Controls, 1 LS Demolition of the Existing North Tank, 1 LS Demolition of Existing Overhead Electric Line & Service Entrance Pole, 1 LS Demolition of Existing Three (3) South Tanks, 1 LS Test Pit, 2 EA Cut & Plug Existing Water Line, Complete, 1 LS Site Grading and Preparation, 1 LS Site Access Road Grading and Preparation, 1,300 LF 42” Diameter Drilled Caissons, 2 EA 470,000 Gallon Water Storage Tank Concrete Foundation Slab, Complete in Place, 2 EA 470,000 Gallon Water Storage Tank, Complete in Place, 1 EA Concrete Valve Vault, Complete in Place, Including All Necessary Vault Drains, 40 LF 8” Water Pipe 235, 1 LS New Overhead Electric Service, Including New Service Entrance Pole, 1 LS Radio Telemetry, 585 LF 6’ Chain Link Fence with (2) 8’ Swing Gates, 1 LS 6” of Crusher Run Stone, 1 LS Trees as shown on Sheet 11A.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents