Similar Projects
Grayson Parking Lot
New Construction - 1,200 SF
Conception
Pittsburgh, PA 15219

Summer Fields Sidewalk Improvements
Infrastructure
Bidding
$80,000 est. value
Pittsburgh, PA

Gill Hall Elementary School , Pleasant Hills Middle School and Jefferson Hills Is Parking Lot Resurfacing and Sidewalk
Infrastructure
Bidding
$300,000 est. value
Pittsburgh, PA 15219

New Overhear Door and Concrete Replacement for Parkway West Career and Technology Center
Post-Bid
Oakdale, PA 15071

Avonworth School District Parking Lot
Post-Bid
Pittsburgh, PA 15237

Allegheny Circle Phase 2 Construction
Results
$2,500,000 to $4,999,999 est. value
PA

Island Avenue Sidewalk Phase 2
Results
McKees Rocks, PA 15136

The Frick Pittsburgh Site Lighting and Parking Lot Project
Renovation
Construction
Pittsburgh, PA 15208

Landside Parking Lot Rehabilitation Project
Infrastructure
Post-Bid
Pittsburgh, PA

Main Street Sidewalk Replacement
Results
Coraopolis, PA 15108

The Jeron X. Grayson Center Overflow Parking Lot
Renovation
Post-Bid
Pittsburgh, PA 15219

Hampton Township Community Park Trail
Results
$380,000 to $515,000 est. value
Allison Park, PA 15101

Raised Crosswalk-Darlington Road
Infrastructure
Post-Bid
Pittsburgh, PA

Emmerling Bridge ADA Parking Project
Results
Less than $28,000 est. value
Pittsburgh, PA

Concrete Sidewalk Replacement
Infrastructure
Post-Bid
Pittsburgh, PA 15236

Last Updated 07/08/2022 06:08 AM
Project Title

Morton Complex Perimeter Trail Phase II - B Part 2

Physical Address View project details and contacts
City, State (County) Upper Saint Clair, PA 15241   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the construction of a new perimeter trail located along Morton Road in the Township of Upper St. Clair including, but not limited to, clearing and grubbing; unclassified bulk excavation; placement of a bituminous walking trail; concrete retaining wall construction; elevated cantilever walkway purchase and installation; storm sewer installation; guiderail installation; placement, maintenance, and removal of erosion and sedimentation control measures; existing utility adjustments; relocation of a section of Morton Road, including the removal of existing bituminous paving and subbase and replacement with aggregate subbase and bituminous pavement; and associated site restoration, complete in place.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents