Similar Projects
Last Updated | 07/08/2022 06:08 AM |
Project Title | Morton Complex Perimeter Trail Phase II - B Part 2 |
Physical Address | View project details and contacts |
City, State (County) | Upper Saint Clair, PA 15241 (Allegheny County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project involves the construction of a new perimeter trail located along Morton Road in the Township of Upper St. Clair including, but not limited to, clearing and grubbing; unclassified bulk excavation; placement of a bituminous walking trail; concrete retaining wall construction; elevated cantilever walkway purchase and installation; storm sewer installation; guiderail installation; placement, maintenance, and removal of erosion and sedimentation control measures; existing utility adjustments; relocation of a section of Morton Road, including the removal of existing bituminous paving and subbase and replacement with aggregate subbase and bituminous pavement; and associated site restoration, complete in place. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |