Similar Projects
Anthony Safe and Welcoming Entry and Miscellaneous Upgrades
Renovation, Alteration
Bidding
Minneapolis, MN 55419

Anthony Safe and Welcoming Entry and Miscellaneous Upgrades
Renovation, Alteration
Bidding
Minneapolis, MN 55419

Lyndale Community School - MEP Upgrades
Post-Bid
Less than $5,000,000 est. value
Minneapolis, MN 55408

White Bear Lake Area High School North Campus Addition & Renovation
Post-Bid
Saint Paul, MN 55110

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Central Education Center
Renovation
Construction
Richfield, MN 55423

Baker OLC Shower/Infirmary Building
Construction
$900,000 to $950,000 est. value
Maple Plain, MN 55359

Discovery Middle School and Woodland Elementary School
Renovation
Pending Verification
Alexandria, MN 56308

Pillsbury Safe and Welcoming Entry
Renovation
Bidding
Minneapolis, MN 55418

Cloquet High School Career and Technical Education and Art Space
Renovation
Post-Bid
Cloquet, MN 55720

High School Area Separation Walls
Results
Columbia Heights, MN 55421

New Community Education Facility
New Construction - 45,000 SF
Construction
$12,500,000 est. value
Worthington, MN 56187

Toilet Room Renovation
Renovation
Bidding
$350,000 est. value
Goodhue, MN

Construction Manager as Adviser Services
Post-Bid
Saint Paul, MN

Last Updated 01/18/2022 10:53 AM
Project Title

2022 Campus Improvements Farmington High School

Physical Address View project details and contacts
City, State (County) Farmington, MN 55024   (Dakota County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes: Two new out buildings and a parking lot on the Farmington High School Campus. One being a stadium entry / restroom building, and the second is a maintenance storage garage/ team room.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents