Similar Projects
U-Haul Valley Hi
New Construction, Renovation - 85,000 SF
Post-Bid
$1,000,000 est. value
Colorado Springs, CO 80910

In-N-Out Burger Distribution Center & Office Building
New Construction - 197,900 SF
Construction
$10,000,000 est. value
Colorado Springs, CO

Transit Campus Expansion Bus Storage Construction
New Construction - 71,218 SF
Post-Bid
$7,000,000 to $13,000,000 est. value
Colorado Springs, CO 80903

Tactical Equipment Maintenance Facility, Fort Carson
New Construction
Design
$10,000,000 to $25,000,000 est. value
Colorado Springs, CO 80902

Tutt and Carefree Self Storage
New Construction
Design
Colorado Springs, CO 80922

Amazon Warehouse
New Construction - 3,953,500 SF
Construction
Colorado Springs, CO

Bijou Street Maintenance Site
Post-Bid
Less than $7,750,000 est. value
Colorado Springs, CO

Sand Shed Emergency Repair
Results
$150,000 to $200,000 est. value
Colorado Springs, CO 80903

Sheet Metal Building for Forestry Operations Center
Post-Bid
Colorado Springs, CO 80903

U-Haul
New Construction - 8,245 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Colorado Springs, CO 80919

Tutt Self Storage
New Construction - 82,884 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Colorado Springs, CO 80923

Zeppelin 3 and 4
New Construction - 240,240 SF
Post-Bid
Colorado Springs, CO 80916

Centralized Water Treatment Project
Results
Colorado Springs, CO

UPS Parcel Distribution Facility
New Construction - 98,291 SF
Post-Bid
Monument, CO

Water Treatment Plant 3/9 Modifications
New Construction
Post-Bid
Monument, CO 80132

Reported 04/21/2021 12:00 AM
Project Title

Construction of a New Metal Building

Physical Address View project details and contacts
City, State (County) Fountain, CO   (El Paso County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 03/24/21
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of the Project will involve the Construction of a new metal building (including all electrical and HVAC components) to house PFC treatment equipment being installed by others. Work also entails site improvements including fencing, concrete sidewalk and asphalt pavement. Construction facilities, such as temporary fencing, laydown yard, graded haul route and an on-site job trailer are already present on the site and will be handed over to the successful bidder for control and maintenance.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents