Similar Projects
Electrical Services
Bidding
Atlanta, GA

Whitlock Park Field Lighting
Bidding
Newnan, GA 30265

Electric Utility Services for Various Locations
Post-Bid
Marianna, Tallahassee, FL - Jesup, GA - Manchester, Pine Knot, KY - Ayer, MA - Guaynabo, PR - Bennettsville, SC

BCCCA HVAC and Lighting Replacement
Post-Bid
Cartersville, GA 30121

Power Distribution Material (Transformers)
Results
Less than $668,019 est. value
College Park, GA

Water Plant Pump 5 Emergency Generator and ATS
Results
Less than $60,000 est. value
Buford, GA 30518

Boggs Transformer Replacement and Switchgear Improvements
Bidding
GA 30318

Holland Plant Boiler Power Separation
Post-Bid
Atlanta, GA 30313

Clean Air Coalition - West Central ESCO
Results
Macon, GA

Automatic Transfer Switches for Portable Generator
Bidding
Brunswick, GA 31520

Energy Conservation Services
Post-Bid
Lincolnton, GA 30817

Fixture Installations at Heritage Academy
Results
Atlanta, GA

Load Bank Testing Repair & Maintenace
Bidding
Gainesville, GA

Unit 3 and 4 Generator Rewind at Hartwell Powerhouse in Hartwell, GA
Post-Bid
$10,000,000 to $25,000,000 est. value
Hartwell, GA

Douglass High Replacement of Can Lights to Led
Results
Atlanta, GA 30318

Reported 01/29/2021 12:00 AM
Project Title

Generator Installations

Physical Address View project details and contacts
City, State (County) Valdosta, GA 31602   (Lowndes County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Generator Installations at the Gornto Pump Station and Mud Creek Wastewater Treatment Plant The project includes installing two 1500 kW fixed generators supplied by the City of Valdosta at the two locations specified below. The work will include furnishing and installing all the appurtenances required to make the generators fully operational. One generator will be installed at the Gornto Pump Station located at 2412 Gornto Road. The other generator will be installed at the Mud Creek Wastewaster Treatment Plant located at 1638 New Statenville Highway.

Details

Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents