Similar Projects
Reported | 02/28/2020 12:00 AM |
Project Title | BWGP Breaker Change Out Project |
Physical Address | View project details and contacts |
City, State (County) | Fayetteville, NC 28302 (Cumberland County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Installation of those materials and the Commission-Furnished materials as indicated necessary to upgrade the subject station. The following is a brief structural description of the upgrades, geographic location, and an explanation of the basic Commission/Contractor responsibilities: The Butler Warner Generation Plant (BWGP) Breaker Change Out Project includes: 1. BWGP Construction: a. Install a Total of Eight (8) 69KV, 1,200-amp Breaker change-outs, including wiring to aluminum bus, interconnection cables between panel and yard equipment through conduit and fiber patch panel. b. Hook up to existing SEL 2411 breaker monitors, each with enclosure and stand c. Associated grounding system, fiber/wiring, and conduit 2. BWGP Substation Demolition: a. Remove a Total of Eight (8) existing 69KV, 1,200-amp Breakers and removing conductors to aluminum bus, Connectors, unused existing cables between panels and to yard equipment. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |