Similar Projects
Last Updated | 06/28/2022 08:00 AM |
Project Title | Washington Aqueduct Second High Reservoir Maintenance and Improvements |
Physical Address | View project details and contacts |
City, State (County) | Washington, DC 20016 (District of Columbia County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The U.S. Army Corps of Engineers, Baltimore District (NAB), has been tasked to solicit for and award construction services for Reservoir Maintenance and Improvements at Washington Aqueduct Division in Washington, DC. The proposed project will be a competitive, firm-fixed-price, contract procured in accordance with FAR 14, Sealed Bidding, via an Invitation for Bid (IFB). The Washington Aqueduct provides potable water to approximately one million people in the District of Columbia and Northern Virginia. As part of the water treatment and supply system, the Washington Aqueduct maintains and operates the Dalecarlia and McMillan Water Treatment Plants (WTPs). Potable water from these WTPs is pumped via the second high service to the Second High Reservoir. This reservoir is an approximate 419 LF x 294 LF subsurface structure that is 24 feet deep that was built in 1931. It has a capacity of 15 MG and is located at the intersection of Van Ness Street and 44th Street, NW, Washington. DC. The project consists of implementing upgrades and improvements to the Second High Reservoir to address operational and sanitary survey issues previously identified. This will result in improved water quality and operation within the distribution system. The work includes the replacement of a brick Sample Building; the replacement of the 24” drain line; installation of mechanical mixers; sealing of all interior joints and cracks; installation of a spread spectrum radio communications antenna; installation of a roof sub-drainage system and the replacement of the perimeter fence. This reservoir is a critical component of the distribution system and so the reservoir outage period is restricted. |
||||||
Details | Dam/Tunnel, Renovation.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |