Similar Projects
New CASS Building Parking Lot Addition
Infrastructure
Post-Bid
Tallahassee, FL 32310

Havana Middle School Sidewalk Project
Infrastructure
Post-Bid
$400,000 est. value
Havana, FL 32333

Miscellaneous Public Infrastructure Engineering Projects
Results
Less than $168,000 est. value
Tallahassee, FL 32301

Sidewalk/Roadway Signing/Pavement Markings
Results
Less than $258,540 est. value
Havana, Quincy, FL 32351

Sidewalk and Associated Work Construction,Continuing supply
Term Contract, Infrastructure
Post-Bid
Tallahassee, FL

Magnolia Drive Multi-Use Trail-Phase I and IV
Results
$2,500,000 est. value
Tallahassee, FL 32302

Riley Elementary School Parking Lot Improvements
Infrastructure
Results
Tallahassee, FL 32304

FAMU Osceola Street Sidewalk Improvement
Infrastructure
Results
Tallahassee, FL 32310

Saxon Street Streetscape Improvements
Infrastructure
Results
Tallahassee, FL 32318

Rotenberger Viewing Platform
Term Contract, Infrastructure
Results
$394,041 est. value
Tallahassee, FL

6th Avenue Pedestrian and Roadway Modifications
Infrastructure
Results
Tallahassee, FL 32303

Ralph Strong Road Sidewalk Project
Infrastructure
Results
Quincy, FL 32351

Half Moon Access Improvements and Vault Toilet
Infrastructure, Alteration
Results
$110,000 est. value
Tallahassee, FL

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

Yorktown Pond Dam Employee Walkway Replacement
Infrastructure
Results
Tallahassee, FL

Last Updated 07/11/2022 12:02 AM
Project Title

Sidewalk Profile

Physical Address View project details and contacts
City, State (County) (Gadsden, Leon Counties)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Road Name: Midway Ops Maintenance - Sidewalk Profile (Ada) Limits: 55320000 Project(S): 42215127296(*) Federal Aid No: N/a Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/a Aquis/flexible Start Time: 15 Days The work specified in this Work Document-driven Contract consists of correcting vertical misalignments or grade changes in pedestrian sidewalks along the primary roads of Gadsden and Leon County. Pedestrian accessible concrete sidewalks, landings, and curb ramps with vertical misalignments between 1/4 , and 1 inch, averaged across the joint width, will be corrected by grinding or lifting. Acceptance of the completed work will be dependent on compliance with the Americans with Disabilities Act (ADA). Vertical alignments of sidewalks exceeding these tolerances or not correctable by these methods, will be replaced by others under a separate Contract. Work locations will be identified and authorized on individual Work Documents, issued by the Department. Maintenance of Traffic and Mobilization will be incidental to the pay item shown in the Bid Proposal.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents