Similar Projects
Target
Renovation
Design
Saint Louis Park, MN 55426

Deerwood Homes and Eagle Lake Area Street Rehabilitation
Infrastructure
Bidding
$5,584,000 est. value
Maple Grove, MN

Townhouse Villages at Eagle Lake Street Rehabilitation
Infrastructure
Bidding
$6,197,000 est. value
Maple Grove, MN

Bluff 25 Culvert Replacement
Post-Bid
Eden Prairie, MN

Plymouth Avenue North Reconstruction
Post-Bid
Minneapolis, MN 55400

Directional Boring
New Construction
Results
Minneapolis, MN 55401

2020 Sewer Lining
Results
Osseo, MN

W 65Th Street Reconstruction
Infrastructure
Bidding
$7,800,000 est. value
Richfield, MN 55423

Hot Poured Joint Sealer
Term Contract
Post-Bid
Minneapolis, MN

4th Street Reconstruction - 2nd Avenue North to 4th Avenue South
Results
Minneapolis, MN

2022 Pavement Joint Sealing
Infrastructure
Bidding
Minneapolis, MN

Glenwood Grade Separation
Renovation
Post-Bid
Minneapolis, MN

South Lake Minnetonka Public Safety Facility Improvements
Results
Shorewood, MN

2022 Sanitary Sewer Lining
Infrastructure
Bidding
$280,000 est. value
Plymouth, MN

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

Last Updated 04/12/2022 01:09 PM
Project Title

2022 Street Improvement

Physical Address View project details and contacts
City, State (County) Minnetrista, MN 55364   (Hennepin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $728,030
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

12,000 S Y Remove Bituminous Pavement 2,000 L F Spot Remove and Replace Concrete Curb and Gutter 32 RDST Minor Grading (on Existing Aggregate Base) 1,100 TON Type SP 9.5 Wearing Course Mix (3,B) 2,100 TON Type SP 12.5 Non Wear Course Mix (3,B) 320 S Y Bituminous Trail Removal and Replacement 2 EACH Concrete Median Nose 2 EACH Construct Pedestrian Ramps 0.5 ACRE Hydromulch Seeding The project scope for the 2022 Street Improvement Project includes full depth pavement removal and repaving, partial replacement of deficient concrete curb, enhancements to storm water drainage and minor repairs to the sanitary sewer systems. This report also briefly discusses associated improvements to Jennings Park. The report contained herein presents costs for the project as well as proposed funding.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents